R96-165 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AMENDMENT TO AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-165 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AMENDMENT TO AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2016 4:23:34 PM
Creation date
4/29/2016 4:23:34 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-165
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AMENDMENT TO THE AGREEMENT SILT RETENTION BASIN - OAKLEY TOWNSHIP
Approved Date
12/2/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Another concern expressed by Mr. Black was the original drain tiles cut and/or rerouted <br /> when the City constructed the retention basin. He is of the opinion that the system installed by <br /> the City contributed to flooding problems to properties south of the City's basin. He generally <br /> suspects that the system is inadequate to accommodate the drainage it receives andJor has <br /> blockages from collapsed lines restricting flows in the pipe. Staff cannot agee that the flooding <br /> problems last Spring were the direct cause of the system. Comments made to staff about the <br /> flooding were based on general observations and opinions which logically placed the City at fault <br /> because the retention basin is a recent and noticeable improvement in the area. Several other <br /> factors may have caused or contributed to the flooding problems including: debris from harvested <br /> crops, dead vegetation or trash that clogged pipe openings or got lodged inside pipes. <br /> The most significant problem noted by Mr. Black was the condition of the dike at the <br /> northeast corner of the basin where the dike was breached. The azea has eroded severely and <br /> does not adequately control the release of water from the basin. In major rainstorms, this has <br /> caused problems to the existing ditches and roadways. The conection of this problem requires <br /> that the area be restored and an outlet controlling the release of water from the basin be <br /> constructed. This will require some surveying and design work to be done. <br /> Staff will not be able undertake the project design due to other project commitments. The <br /> decision was made to request a proposal for the work from the consulting firm of Cochran & <br /> Wilken, Inc. as the City has an open existing contract with them; they did the original basin <br /> design, they are familiar with the area and have much of the information required for the design <br /> readily available. They have submitted a proposal (copy attached) to perform the necessary work. <br /> The fee for the work is an amount not to exceed $8,000. The delay in starting this work has <br /> related to the HARZA study and staffs review of the study recommendations. <br /> The study, recently completed by HARZA, noted that the basin has potential as an <br /> off-stream storage area to aid the City in meeting its water storage needs. Staff is withholding its <br /> final decisions about the disposition of the site until further consideration can be given to the <br /> future use of the basin. This enables the City to reserve a water storage option in the event other <br /> more favorable options are deternuned to be unacceptable and/or not workable. It is desired to <br /> minimize expenditures to the basin until the basin's future is decided. The proposed work is <br /> considered to be of a property maintenance nature and is being done to minimize the City's <br /> exposure to potential liabilities. The liabilities may relate to the flooding of private cropland or <br /> damages to the township's roads and ditches from the release of water from the basin. <br /> The estimated cost for these repairs is approximately $15,000 to $20,000. The relative <br /> high percentage of design fees to construction costs is attributed to the required surveying and <br /> acquisition of background information. This information must be updated to reflect current <br /> conditions in the areas that have changed since the basin's original design and construction. The <br /> engineering and construction costs are eligible expenses for the South Water Treatment Plant <br /> Bond Fund. Monies are available in this Fund. <br />