My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-164 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-164 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2016 4:26:10 PM
Creation date
4/29/2016 4:26:09 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-164
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT SANITARY SEWER REPLACEMENT PROGRAM JASPER & GARFIELD CITY PROJECT 9643A
Approved Date
12/2/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�O�.Df C� <br /> C <br /> V o0 <br /> ��"i <br /> %[LINO�Y <br /> November 21, 1996 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 96-81 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L. Williams, Jr., City Manager <br /> Bruce A. McNabb, Director of Public Works � <br /> Stephen P. Swanson, City Engineer �l� <br /> SUBJECT: Sanitary Sewer Replacement Program <br /> Jasper& Ga�eld <br /> City Project 9643A <br /> The sanitary sewer main in Garfield Avenue west of Jasper Street is in poor shape and <br /> susceptible to blockages and collapse. An effort was made to have the main inspected by a video <br /> camera to determine the condition of the line and location of service connections. This effort was <br /> unsuccessful because of obstructions in the line from broken or collapsed pipe that prevented the <br /> camera from being run through the entire length of the main. The decision was made by the <br /> Engineering Division to replace the entire 270 feet of main. <br /> The Engineering Division prepared the specifications for the project. The project was <br /> advertised and bids were received and opened on November 21, 1996, for the subject project. <br /> The results of the bid opening are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate(Eng. Div.) $ 47,080.00 --- <br /> Springfield Mechanical Corp. 34,225.00 (27.30) <br /> Bodine Services, Inc. 42,987.50 ( 8.69) <br /> Burdick Plumbing&Heating Co., Inc. 43,705.00 ( 7.17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.