My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-154 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-154 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:57:15 PM
Creation date
5/3/2016 1:57:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-154
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT - PUMP STATION MODIFICATIONS (CORLEY CLOSURE) CITY PROJECT 9421A
Approved Date
11/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti O�•DEc' <br /> � c <br /> v o0 <br /> ■� <br /> %ILINO�S <br /> November 7, 1996 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 96-77 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L. Williams,Jr., City Manager .A� <br /> Bruce A. McNabb,Director of Public Works ��"` <br /> Stephen P. Swanson, City Engineer�j <br /> John A. Smith,Water Production Manager <br /> SUBJECT: SWTP-Pump Station Modifications (Corley Closure) <br /> City Project 9421A <br /> This project involves the installation of a new 4-inch force main and modifications to an <br /> existing lift station near the City's raw water pump station at the Lake Decatur Dam. The new <br /> force main replaces an 8-inch force main that connected to a sanitary sewer main abandoned by <br /> the Sanitary District of Decatur (SDD). The abandonment by SDD was planned because of the <br /> minin o erations b the Vulcan Materials Com an . This abandonment re uired the Cit to <br /> g P Y P Y q Y <br /> reroute its sanitary sewer force main to another location. <br /> The force main size was reduced from an 8-inch to a 4-inch diameter as the old main served <br /> the City's original water works plant that has been replaced by the new South Water Treatment <br /> Plant. The new 4-inch force main will serve only the raw water treatment plant which generates <br /> substantially less wastewater flows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.