Laserfiche WebLink
� r <br /> Project...........................NWTP- Roof Repair ENGINEER'S ESTIMATE Gates 8�Johnson Roofing King-Lar Company , � <br /> 1550 E. Eldorado 2020 E. Olive St. <br /> City Project...................9641 Decatur, IL 62521 Decatur, IL 62525 <br /> Bid Date.......................November 12, 1996 <br /> Time.............................10:00 A.M. 5% BID BOND 5°�BID BOND <br /> "Math Error Bolded <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE <br /> INSPECTION OF ROOF L.S. 1 250.00 250.00 0.00 0.00 365.70 365.70 <br /> REPAIR OF ROOF JOINT COVER L.F. 50 8.75 437.50 10.00 500.00 6.30 314.99 <br /> REPAIR OF ROOF JOINT COVER AT WALL L.F. 150 12.75 1,912.50 10.00 1,500.00 5.20 780.00 <br /> REMOVE&REPLACE ROOF JOINT COVER L.F. 50 19.75 987.50 20.00 1,000.00 14.77 738.70 <br /> REMOVE&REPLACE ROOF JOINT COVER AT L.F. 100 23.75 2,375.00 20.00 2,000.00 14.76 1,475.50 <br /> WALL <br /> REMOVE&REPLACE ROOF SURFACE NOT S.F. 500 7.00 3,500.00 7.50 3,750.00 12.74 6,369.53 <br /> INCLUDING 1.5-INCH RIGID INSULATION <br /> REMOVE 8c REPLACE ROOF SURFACE S.F. 400 16.00 6,400.00 9.35 3,740.00 17.37 6,947.00 <br /> INCLUDING 1.5 RIGID INSULATION <br /> REPAIR OF ROOF DRAINS EA. 2 175.00 350.00 125.00 250.00 91.45 182.90 <br /> CALJLKING L.F. 100 2.75 275.00 1.00 100.00 1.00 100.00 <br /> TOTAL BID AS CORRECTED $16,487.50 �12,840.00 517,274.32 <br /> Percent Over or(Under)ENGINEER'S ESTIMATE (22.12) 4.77 <br /> 1 <br />