My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-128 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-128 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 3:10:44 PM
Creation date
5/3/2016 3:10:44 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-128
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WATERMAIN REPLACEMENT PROGRAM CITY PROJECT 9620A
Approved Date
9/30/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�of.DFC' <br /> -. C <br /> v o0 <br /> �/[lINO Y I�i <br /> September 24, 1996 � <br /> PUBLIC WORKS MEMORANDUM I� <br /> NO. 96-67 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L. Williams,Jr., City Manager <br /> Bruce A. McNabb, Director of Public Works� <br /> Stephen P. Swanson, City Engineer�G, <br /> SUBJECT: Watermain Replacement Program <br /> City Project 9620A <br /> The City's 6-inch watermain extending west along Harrison Avenue from the 24-inch <br /> watermain in Brush College Road and under the Illinois Central Ra.ilroad tracks has experienced a <br /> number of recent breaks and must be replaced. At the time Brush College Road was <br /> reconstructed, the repair history of the watermain did not indicate that the watermain needed to <br /> be replaced. The work essentially involves excavating a bore pit on the west side of the railroad <br /> tracks, boring an 18-inch casing pipe under the tracks, installing about 110 feet of 6-inch <br /> watermain and connecting to the 24-inch main in Brush College Road. The existing watermain <br /> will be abandoned in place after the new watermain is put into service. <br /> As part of this project, the City will be cooperating with Macon County and the Illinois <br /> Department of Transportation to permit them to examine the Brush College Road pavement and <br /> to make repairs to a drainage structure. <br /> The project was designed in-house and bids were received and opened on September 24, <br /> 1996, for this project. The results of the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $ 53,394.00 --- <br /> Bodine Services, Inc. $ 55,455.00 3.86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.