My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-125 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-125 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 3:17:23 PM
Creation date
5/3/2016 3:17:23 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-125
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT NWTP - SLUDGE DISPOSAL CITY PROJECT 9642
Approved Date
9/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Of•DEC� <br /> — C <br /> v ee <br /> �/lll� <br /> September 10, 1996 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 96-65 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: William B. Sands,Acting City Manager <br /> Bruce A. McNabb, Director of Public Works��/ <br /> Stephen P. Swanson, City Engineer�7 <br /> John A. Smith,Water Production Manager <br /> SUBJECT: NWTP-Sludge Disposal <br /> City Project 9642 <br /> The City's Water Production Division has, subject to receiving Illinois Environmental <br /> Protection Agency (IEPA) approval, arranged to dispose of approximately 5,000 tons of sludge <br /> from the North Water Treatment Plant. The sludge will be hauled to a mine reclamation site in <br /> Jeiseyville, Illinois where it will be used to cap off a former mine site prior to the final placement <br /> of topsoil. Jeiseyville is located immediately southeast of Kincaid approximately 40 miles <br /> southwest of Decatur. <br /> John Smith, the City's Water Production Manager, is expecting to receive the IEPA approval <br /> within the next month. After the permit is received, the contract will be executed and the <br /> Contractor will begin hauling the sludge. This matter is brought to Council in advance of <br /> receiving the IEPA permit to be prepared to execute the contract upon receipt of the IEPA permit <br /> and reduce lost time in having the Contractor start work. Time will be critical as the work at the <br /> reclamation site is expected to be completed on or before December 1 of this year depending on <br /> the rate of progress and weather constraints. <br />
The URL can be used to link to this page
Your browser does not support the video tag.