My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-63 AUTHORIZING A MULTI-YEAR AGREEMENT - Bainbridge, Gee, Milanski & Associates, Inc.
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-63 AUTHORIZING A MULTI-YEAR AGREEMENT - Bainbridge, Gee, Milanski & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 9:42:29 AM
Creation date
6/13/2016 9:42:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-63
Res Ord Title
AUTHORIZING A MULTI-YEAR AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI & ASSOCIATES, INC. FOR PROFESSIONAL ENGINEERING SERVICES IN SUPPORT OF THE SANITARY SEWER SYSTEM - CITY PROJECT 2016-05
Approved Date
6/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System and Separate Sanitary Sewer System and the documentation of the condition of <br /> portions of the Respondent's Combined Sewer System and Separate Sanitary Sewer <br /> � System causing or contributing to SSOs,Unauthorized Combined Sewer Overflows,and <br /> Property Backups. The goal of the SSA Study is to identify sources and estimate <br /> quantides of excessive UI entering Respondent's Separate Sanitary System,to eliminate <br /> sources of excessive UI entering the Respondent's Separate Sanitary System,to mitigate <br /> the impact of excessive UI on SSOs and Property Backups within Respondent's Separate <br /> Sanitary Sewer System and to develop alternatives to reduce ident�ed sources of UI. <br /> The SSA study will also target the Respondent's Combined Sewer System through the <br /> modeling of both the sanitary sewer systems and the development of altematives to <br /> prevent Unauthorized Combined Sewer Overflows and Property Backups within the <br /> Combined Sewer System. The final SSA Study must include,but is not limited to: <br /> a. An chan es and deviations from the a roved SSA work lan. <br /> Y g <br /> PP P <br /> b. A physical survey of both the Combined Sewer System and the Separate Sanitary <br /> Sewer System necessary to determine the extent of both systems. This includes <br /> the confirmation of the location,size,and capacity of all major sewers,manholes, <br /> and pump stations <br /> c. A lon�term plan to visually inspecting major sewers,manholes, and pump <br /> stations for structural deficiencies, if not already done so. <br /> d. An assessment of the various components of the sanitary sewer system to further <br /> identify areas within the Separate Sanitary Sewer System with the highest <br /> contribution of N and to prioritize mitigation in these locations. Through this <br /> assessment,Respondent must include but not be Iimited to the following <br /> elements: <br /> i. Monitor the contribution from rainfall to a sewershed within the <br /> Respondent's jurisdictional boundary through the use of rain gauges,as <br /> necessary to the UI prioritization of sub-basins described above. <br /> ii. Conduct both a dry and wet weather flow monitoring program,at a <br /> minimum,at key locations within the Combined Sewer System and the " <br /> Separate Sanitary Sewer System. Such monitoring should be conducted to <br /> adequately chazacterize both the sanitary sewer collection systems with <br /> respect to sewersheds,sewer sub-basins,or city neighborhoods within the <br /> Separate Sanitary Sewer Collection System that exhibit high UI. <br /> iii. Tdentify the locations of sources of UI clear water entry into the separate <br /> sewer system,and estimate the benefit(in terms of dollars per gallon of UI <br /> removed)of removing each source. <br /> A2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.