Laserfiche WebLink
E. EXTRA WORK AND CHANGE ORDERS. The Consulting Engineer shall only perform the <br /> wark authorized by this contract and defined in the Scope of Wark(attached hereto,marked Exhibit <br /> A, incorporated by reference herein and made a part of this Agreement). Should the size or <br /> complexity of the project exceed the amount of work contemplated by this contract ar defined in the <br /> Scope of Wark,the Consulting Engineer shall obtain written authorization in the form of a Change <br /> Order from the City's Representative,to perform extra work before such wark is actually performed. <br /> A Change Order form is included in this Agreement as Exhibit D.The cost to perform any work prior <br /> to written authorization shall be paid exclusively by the Consulting Engineer and shall not be <br /> reimbursed by the Ciry. <br /> The Consulting Engineer expressly acknowledges,recognizes and agrees that the only authority to <br /> approve change orders to this Agreement or the Scope or Services or the cost(s) therein is with the <br /> City Council of the City. <br /> SECTION II. BASIC SERVICES <br /> A. STUDY AND REPORT PHASE. <br /> The Consulting Engineer shall: <br /> 1. Cit. '�quireinents. Review available data and consult with the City's Representative to clarify <br /> and define the City's requirements for the Project. <br /> 2. Advise Regardin�Additional Data. Advise the City's Representative as to the necessity of the <br /> City's providing or obtaining from others data or services of the types described in Section V(C) <br /> in arder to evaluate or complete the Project, and act as the City's representative in connection <br /> with any such services. <br /> 3. Technical Analvsis. Provide analysis of the City's needs,planning surveys, site evaluations,and <br /> comparative studies of prospective sites and solutions. <br /> 4. Economic Analvsis. Provide a general economic analysis of the City's requirements applicable to <br /> various alternatives in accordance with economic parameters and assumptions provided by the <br /> City s Representative. <br /> 5. Report Preparation. Prepare a report("Study Report") containing schematic layouts, sketches and � <br /> conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved <br /> and the alternative solutions available to the City of Decatur. The Study Report shall also set <br /> forth the Consulting Engineer's findings and recommendations with opinions of probable costs <br /> for the Project,including construction cost,contingencies,allowances for charges of all <br /> professionals and consultants, allowances for the cost of land and rights-of-way,allowances for <br /> the relocation of utility facilities and equipment if necessary,and compensation for or damages to <br /> properties and interest and financing charges (all of which are hereinafter called"Project Costs"). <br /> Specific requirements for the Study Report are included in Exhibit A, Scope of Services. <br /> 6. Report Presentation. Furnish paper copies and digital copies of the Study Report in the number <br /> and format specified in Exhibit A, Scope of Work, and present and review the Study Report in <br /> person with the City as the City's Representative shall direct. The cost of reproduction of the <br /> Study Report shall be considered a reimbursable expense and paid in accordance with Section <br /> V(C)of this Agreement. <br /> 7. Completion Time. The Study Report shall be completed, submitted and accepted by the City's <br /> Representative within the time period set forth in Exhibit C,Project Timeline. <br /> Last Revised:04/29/2015 <br />