Laserfiche WebLink
� . <br /> or server build ensure communications are working,connect to the message switch,and configure wilh mobile <br /> 1 Technical seNices f , <br /> communications. <br /> QA services for application supporl and configuration to other applications. <br /> Also includes Maintenance Training and the instaliation of the digital dispatchlMobile Field Reporting application software on up to <br /> five(5)mabfle computers. <br /> Part Number: MCT-SWI-tMPL <br /> Price:$1400 <br /> Description:IMPLEMENTATION OF BASE MESSAGE SWtTCH <br /> Long Description:One(1)day of technical services tu configure ior State Access and to conduct Maintenance Training. <br /> Pad fJumber. MCT-SWI-INST ~ <br /> Description:INSTALLATI�N OF BASE MESSAGE SWITCH <br /> Long Description:.installation and setup of SunGard Public Sector's Base Message Switch applicati�n softwace. <br /> The Message Switch must run on Windows 20D0 Server or higher. <br /> Part Number. MCT-IMPL <br /> Description:MOBILE IMPLEMENTATION SERVICES <br /> Long Description:SunGard Public Sector technical services for MCT systemfdata verificafion after the system administrator training <br /> and the code tables are built. This includes a SunGard Public Sector representative on site the day MCT goes live. <br /> Includes on-site Technical Services;QA testing prior to user training;and on-site go-live. <br /> Parf Number:MFR-MNT-TRN <br /> Description:MOBILE FIELD REPOR7ING MAINTENANCE TRAINING <br /> Long Description:Training for system administrat�rs and key pe�sonnel(46 people max.)responsible for system configuration <br /> (including seiting codes reflecting agency business practices)and maintenance. 7opics include setting up the MFR application on <br /> the server and laptops,report submission and approval,and key interactions with RMS. Class duration=up to 1 day. <br /> ; Part Number.MCT-1Tt'TRN <br /> � Description:MCT TRAIN THE TRAINER TRAINING <br /> �t Long Description:Four(4)days of on-site training assistance designed to prepare agency training staff for conducting MCT User <br /> � Training. OSSI Training Specialist provldes one(1}day of set-up,one(1)day of instruction on MCT followed by two(2)days of <br /> consulting,including observing and providing feedback to agency trainers. <br /> Part Number.MFR-'iTi'TRN , <br /> Description:MOBILE FIELD REPORTING TRAIN TNE TRAINER TRAINING <br /> Long Descriptlon:Seven{7)days of on-site training and assistance designed to prapare agency t�aining staff for conducting MFR <br /> User Training. OSSt Training Specialist provides one(1)day of set-up,three(3)days of instruction on MFR fo{lowed by three(3) �' <br /> days of consulting,including observing and providing feedback to agency trainers. <br /> Part Nurnber:MFR-INST <br /> Description: INSTALLATION MOBILE FIELD REPORTING <br /> Long Descciption:Two(2)days of QA services to install and c�nftgure OSSI MFR. (ncludes instail and configuration of add on <br /> modules. <br /> Pari Num6er:MFR-IMPL <br /> Description: IMPLEMENTATION FOR MOBILE FIELD REPORTING <br /> Long Description:QA services to test OSSI MFR. <br /> Part Number:MCT-ADD-TRN <br /> Descripiion: MGT 8 MFR ADD ON MODULE USER TRAINING <br /> Long Description:Training for MCT and MFR Add-on Modules to include: <br /> One(1)day o(Accident Reporting <br /> Part Number:RM5-BASE-75� <br /> Descripti�n: BASE RECORDS MANAGEMENT SYSTEM-75 WORKSTATI�N � <br /> Long Description:SunGard Public Sector's Client Server Version of RMS(requires Microsoft's Windows 2000 Server or higher) <br /> inciudes: <br /> Incident/Offense Module <br /> CrimeMatch Rsporting <br /> Arrest Module <br /> '� Warrants Module <br /> �� UCR Property Management <br /> Master Name Modufe <br /> Master Vehicle Module <br /> Page 17 of 26 <br /> SPS License 7J112010 <br />