My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-51 TO APPROPRIATE ADDITIONAL MOTOR FUEL TAX FUNDS FOR MICROSURFACING OF STREETS AND HIGHWAYS
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-51 TO APPROPRIATE ADDITIONAL MOTOR FUEL TAX FUNDS FOR MICROSURFACING OF STREETS AND HIGHWAYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:26:56 AM
Creation date
6/13/2016 11:26:11 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-51
Res Ord Title
TO APPROPRIATE ADDITIONAL MOTOR FUEL TAX FUNDS FOR MICROSURFACING OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE CITY PROJECT 2015-24
Approved Date
5/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' , 1 <br /> ���II'IOLS ��3ttl'Y1P11t Affidavit of Availability <br /> of Transportation For the Letting of 5/4/2016 <br /> ' (Letting date) <br /> Bureau of Construction <br /> 2300 South Dirksen Parkway/Room 322 Instructions: Complete this form by either typing or using black ink. <br /> S rin field, ���If101S 62764 "Authorization to Bid"will not be issued unless both sides of this fortn are <br /> P 9 completed in detail. Use additional forms as needed to list all work. <br />, ' <br /> Part I. Work Under Contract <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> I'� ' recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> I� ' Contract Number 76H74 76H72 93649 I-13-4629 68C80 <br /> Contract�th IDOT IDOT Dunn Co FH Paschen IDOT <br /> Estimated Completion Date 6130/2016 6/30/2016 6/30/2016 8/3112016 7/31/2016 <br />!I ' Total Contract Price Accumulated Totals <br /> 639,959.49 642,481.67 219,494.67 47,410.00 734,828.11 <br /> Uncompleted Dollar Value if Firm is the <br /> Prime Contractor 541,439.59 83,588.58 0.00 0.00 734,828.11 1,359,856.28 <br />' ' Uncompleted Dollar Value if Firm is the <br /> Subcontractor 219,494.67 47,410.00 266,904.67 <br /> Total Value of All Work 1,626,760.95 <br /> ' Part II. Awards Pending and Uncompleted Work to be done with your own forces. <br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work ACCUmUlated <br /> subcontracted to others will be listed on the reverse of this fortn. In a joint venture,list only that portion of the work to be done by your <br /> company. If no work is contracted,show NONE. Tot81S <br /> ' Earthwork 0.00 <br /> Portland Cement Concrete Paving 0.00 <br /> ' HMA Plant Mix 0.00 <br /> HMA Paving 0.00 <br /> Clea�&Seal CrackslJoints 0.00 <br /> ' Aggregate Bases&Surfaces 0.00 <br /> Highway,R.R.and Waterway Structures 0.00 <br /> ' Drainage 0.00 <br /> Electrical 0.00 <br /> Cover and Seal Coats 0.00 <br /> ' Concrete Construction 0.00 <br /> Landscaping 0.00 <br /> ' Fencing 0.00 <br /> Guardrail 0.00 <br /> Painting 0.00 <br /> ' Signing 0.00 <br /> Cold Milling,Planning&Rotomilling 0.00 <br /> Demolition 0.00 <br /> ' Pavement Markings(Paint) 0.00 <br /> Other Construction(List) 0.00 <br /> ' Micro-Surfacing 318,807.97 70,939.07 219,494.67 47,410.00 430,042.71 1,086,694.42 <br /> 0.00 <br /> Totals 318,807.97 70,939.07 219,494.67 47,470.00 430,042.71 1,086,694.42 <br /> ' Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> ' <br /> Printed 5/6/2016 Page 1 of 10 BC 57(Rev.08/17/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.