My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-76 AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGMENT (Dewberry Architects)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-76 AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGMENT (Dewberry Architects)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 10:28:36 AM
Creation date
6/29/2016 8:16:16 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2016-76
Res Ord Title
AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGEMENT WITH DEWBERRY ARCHITECTS, INC. FOR THE FIRE FACILITY REHABILITATION INITIATIVE
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.8 Preparation for,and attendance at a dispute resolution proceedin�or legal proceedin�.except�vhere <br /> the Architect is party thereto; <br /> .9 Evaluation of the qualificatioos of bidders or persons providing proposals; <br /> .10 Consultation conceming replacement of Work resulting from fire or othcr cause during coristruction; <br /> or <br /> .11 Assistance to the tnitial Decision Mal:er,if other than the Architect. <br /> § 4.3.2 To avoid delay in the Construction Phase,the Architect shall provide the following Additional Services, <br /> notify the O�mer with reasonable promptness,and explain the facts and circumstances siving rise to the need. If the <br /> Owner subsequently determines that all or parts of those services are not required,the Owner shall give prompt <br /> written notice to ti�e Architect,and the Owner shall have no further obligation to compensate tf�e Architect for those <br /> services: <br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the <br /> Architect(a deductive change order to the Contractor's contract sum will be processed periodically <br /> for the cost of such services incurred hy the Owner); <br /> .2 Rcsponding to the Contractor's requests for information that are not prepared in eccordance with the <br /> Contrect Documents or where such information is avnilable to the Contractor from a careful study <br /> and compatison of the Contract Documents,field conditians,other Owner-provided information, <br /> Contractor-prepnred coordination drawings,or prior Project correspondence or documentation{a <br /> deductive change order to the Cootractor's contract sum will be processed periodicafly for the cost of <br /> such srn+ices incurred by the Owner); <br /> .3 Preparing Chan�e Orders and Construction Change Directives that require evaSuation of Contractor's <br /> proposals and supponing data,ar the preparation or revision of Instruments of Service{a deductive <br /> chan�e order to the Contractor's contract sum will be processed periodically for the cost of such <br /> services incucred by the Owner); <br /> .4 Eva�uating an extensive number of Claims as the Initial Decision Maker; <br /> .5 Evafuatin�substitutions praposed by the Owner or Contractor and making subsequent revisions to <br /> [nstruments of Service resulting there&om(a deductive change order to the Contractor's contract sum <br /> will be processed periodical[y for the cost of such services incurred by the Owner);or <br /> .6 Providing Construction Phase Services 60 days after(1)the date of Substantial Completio�of the <br /> Work or(2)the anticipated date of Substantial Completion identified in[nitial Information, <br /> whichever is earliec{a deductive chan�e order to the Contractor's contract sum will be processed <br /> periodically for the cost of such services incurred by the Owner}. <br /> § 4.3.3 The McF�itect sl�atl provide Construction Phase Services exceedin�the limits set forth below far each station <br /> building as Additional Services. When the limits below are reached,the Architect shall notify the Owner. <br /> .1 two (2)reviews of each Shop Drawing,Product Data item,sample and similar submittal ofihe <br /> Contractor(a deductive change order to the Contractor's contract sum will be processed periodicaily <br /> for ihe cost of such services incu�red by the Owner) <br /> .2 eight{8)visits to the site by the Architeci over the duration of the Project duric►g consiruction <br /> .3 one 1 )visits for any portion of the Work to de�ermine whether such portion of the Work is <br /> substantially complete in accordance with the requirements of'the Contract Documents(a deductive <br /> change order to ihe Contrector's contract sum will be processed periodically for the cost oFsuch <br /> services incurred by the Owner) <br /> .4 one I )visits for any portion of the Work to determine final completion(a deductive change order <br /> to the Contractor's contract sum will be processed periodically for the cost of such services incurred <br /> by the Owner) <br /> § 4.3.4 If the services covered by this Agreement have nol been completed within Eig}tteen (18)months of the <br /> date of this Agreement,through no fault of the Architect,extension of the Architect's services beyond that time shaU <br /> be compensated as Additional Services. <br /> ARTICLE 5 OWNER'S RESPONSIBIUTIES <br /> § 5.1 Unless otherwise provided for under this Ageement,the Owner shall provide information in a timely manner <br /> regerding requirements for and limitations on the Project,including e written program which shall set forth the <br /> Owner's objectives,schedule,constraints and cri�eria,including space requirements and relationships,flexibility, <br /> expandability,special equipment,systems and site requirements. Within 15 days after receipt of e written request <br /> ��� AIA Doeumont 8101"'—2007(fortmAy Bi61"'—1897).Copyrfyht O 197<.1978,1987,1997 and 20W by The Amerken Inatitute of ArchNeels.All rlphls <br /> marv�d.WARNING Thls AlA' Uocument Is protected by U,S Copyrlghl Law and Intomatlonal Treatles.Unauthorized reproducllon or diatrihution ,10 <br /> of th{e AIA� Document,or any poAlon o(It,may result in severe clvii and crlminal ponaltlas,and wfll be praaecuted to the maximum extent passlbla <br /> ! u nder the law Thb document wes pmdueed by AlA soHwsra at 15:27:15 on 08lOBl2016 under Ordet No.8563709714_1 which e�iras on 071012018,end Is � <br /> notfor►esala. <br /> User Nobs: (1937316371) <br />
The URL can be used to link to this page
Your browser does not support the video tag.