My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 8:47:40 AM
Creation date
6/29/2016 8:46:46 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-79
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH KINNEY CONTRACTORS, INC., FOR 2016 STORM DRAINAGE IMPROVEMENTS PROJECT, CITY PROJECT 2016-30
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� GENERAL CONDITIONS <br /> GC-16 PERMITS <br /> � It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be waived <br /> � for those permits issued by the City of Decatur. <br /> GC-17 DOCUMENTATION OF EXISTING CONDITIONS <br /> � The Contractor shall provide DVD or Digital video of existing facilities along the route or <br /> area of all construction, prior to the start of such construction. Construction of this facility will <br /> � generally be along street right-of-way containing trees, bushes, fences, driveways and similar <br /> items. Special attention shall be given to coverage of the entire easement and immediate adjacent <br /> � areas which might be disturbed during construction. <br /> The video shall be adequate to serve as a basis for comparison in determming whether the <br /> � terms of the specifications with respect to replacements, restoration and/or preservation of existing <br /> surfaces have been complied with. One print of the video taken shall be given to the Engineer for <br /> his files. The cost for this item shall be included in the respective prices for the vanous items of I <br /> � work. <br /> GG18 PREVAILING WAGE RATES <br /> jThe Contractor shall supply the Engineer with weekly certified copies of the payroll for <br /> both the prime Contractor and their subcontractors through ePrismSoft. City Engineering will <br /> � monitor the payroll for compliance with the applicable "prevailing wage rates" as required by the <br /> Special Conditions of this contract. <br /> ' Access to ePrismSoft has been furnished by the City of Decatur. To activate access, the <br /> Prime Contractar and all subcontractors are to contact Human Capital Development at <br /> webnfo(cr'�eprismsoft.com or(309) 692-6400. <br /> � GC-19 PROJECT MAINTENANCE <br /> � Should the City become aware of an unsafe condition existing within the scope of this <br /> project, the City will attempt to contact the Contractor to resolve the unsafe condition. However, <br /> if the City is unable to contact the Contractor's designated representative or if the Contractor fails <br /> � to respond within a reasonable period, the City will perform the necessary operations and the cost <br /> for labor, equipment and materials will be deducted from the contract. <br /> � GC-20 ROYALTIES, PATENTS AND COPYRIGHTS <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or <br /> � claims for infringement of copyrights and patent rights and shall hold the Owner and Engineer <br /> harmless from loss on account thereof, but shall not be responsible for such defense or loss when a <br /> particular design, process or product of a particular manufacturer or manufacturers is required by <br /> 1 the Contract Documents or where the copyright violations are contained in Drawings, <br /> Specifications or other documents prepared by the Owner or Architect. However, if the <br /> Contractor has reason to believe that the required design, process or product is an infringement of <br /> � a copyright or a patent, the Contractor shall be responsible for such loss unless such information is <br /> promptly furnished to the Architect. <br /> , 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.