R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 8:47:40 AM
Creation date
6/29/2016 8:46:46 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-79
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH KINNEY CONTRACTORS, INC., FOR 2016 STORM DRAINAGE IMPROVEMENTS PROJECT, CITY PROJECT 2016-30
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� GENERAL CONDITIONS <br /> � GC-25 USE OF FIRE HYDRANTS <br /> � Prior to any use of fire hydrants by the Contractor, a permit shall be obtained from the <br /> Water Services Division in accordance with Sections 20 and 23 of Chapter 64 of the City Code. <br /> Water Services Division is located at 2600 North Jasper Street; phone 217-875-5705. The permit <br /> � will be issued at no charge to the Contractor. <br /> GG26 TERMINATION FOR PUBLIC CONVENIENCE <br /> � The City may, by written order, terminate the contract or any portion thereof after <br /> determining that for reasons beyond either City or Contractor control, the Contractor is prevented <br /> � from proceeding with or completing the work as originally contracted for, and that termination <br /> would, therefore, be in the public interest. Such reasons for termination may include, but need not <br /> be necessarily limited to, Executive Orders of the President relating to prosecution of war or <br />, ,, national defense, national emergency which creates a serious shortage of materials, orders from <br /> duly constituted authorities relating to energy conservation, cessation of funding from third parties <br /> � and restraining orders or injunctions obtained by third-party citizen action resulting from national <br /> or local environmental protection laws or where the issuance of such order or injunction is <br /> primarily caused by acts ar om�ssions of persons or agencies other than the Contractor. <br /> � When contracts, or any portion thereof, are definitely terminated or cancelled, and the <br /> Contractor released before all items of work included in his/her contract have been completed, <br /> � payment will be made for the actual number of units of items of work completed at contract unit <br /> prices, or as specified for partially completed items, and no claims for loss of anticipated profits <br /> will be considered. Reimbursement for organization of the work and moving equipment to and <br /> from the job will be considered where the volume of the work completed is too small to <br /> �� compensate the Contractor for these expenses under the contract unit prices, the intent being that <br /> an equitable settlement will be made with the Contractor. <br /> � Acceptable materials, obtained by the Contractor for the work, that have been inspected, <br /> tested and accepted by the Engineer, and that are not incorporated in the work may, at the option <br /> � of the Engineer, be purchased from the Contractor at actual costs as shown by receipted bills and <br /> actual cost records at such points of delivery as may be designated by the Engineer. <br /> � Termination of a contract, as stated above will not relieve the Contractor or his/her surety <br /> of the responsibility of replacing defective work as required by the contract." <br /> � <br /> r <br /> , END OF GENERAL CONDITIONS <br /> � <br /> ' 36 <br />