Laserfiche WebLink
OF��EC C ity of Decatu r <br /> � �i <br /> u A CHANGE OR EXTRA WORK ORDER <br /> Wu �• <br /> '/[LINO�Y <br /> No. 13 <br /> Contract No. 8918-E Project Lake Decatur Dam Imnrovements <br /> Kind of Work Spillwav Concrete Rehabilitation Date Prepared August 2, 1996 <br /> To Tom Smith Contractor Osage Constructors <br /> You are hereby requested to make the following changes from the pians or to do the following extre work on your coolract dated 11/21/94 <br /> A-Description of change to be made or extra work to be completed: <br /> 1. Mobilization for wing wa11 repair. <br /> 2. Concrete removal. <br /> 3. Furnishing and placing reinforcement. <br /> 4. Furnishing and placing shotcrete. <br /> B-Reason for ordering change or extra work: <br /> 1-4. To resurface the four downstream wing walls on the Lake Decatur dam. Further <br /> investigation on the downstream wing walls determined that the existing walls <br /> required a more thorough concrete repair than originally determined. The existing <br /> contract called for spot repair and crack sealing of the walls. This work will <br /> resurface most of the exposed concrete on the wing walls. <br /> (Continued on reverse side) <br /> c"i <br /> Approve ��` �', 19�'�� <br /> ayor <br /> � , <br /> Receipt is acknowl c nge or extra work and the terns of settlement are hereby agreed to: <br /> �" /IVL� �Z, 19�� <br /> Contractor <br />