My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-106 AUTHORIZING CHANGE ORDER
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-106 AUTHORIZING CHANGE ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2016 11:24:04 AM
Creation date
7/5/2016 11:24:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-106
Res Ord Title
AUTHORIZING CHANGE ORDER LAKE DECATUR DAM SPILLWAY REHABILITATION CITY PROJECT 8918-E
Approved Date
8/5/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , _. . <br /> Page 2 - • - <br /> area required to do this work basically set up because of the other work they are doing on the <br /> dam. This represents a cost savings to the City. <br /> Staff directed Osage Constructors Inc. to provide a proposal to complete the work as a <br /> ' change order to their current contract with the City. Osage submitted a proposal of$275,156.00 <br /> to do this additional work. This proposal was reviewed and considered to be representative of the <br /> work involved. Osage will have to arrange for additional equipment and material to do this work. <br /> It is recommended that City Council approve the attached resolution authorizing a change <br /> order to the City's contract with Osage Constructors Inc. for the Lake Decatur Dam <br /> Rehabilitation (City Project 8918E) for the restoration of the north and south wingwalls of the <br /> dam in the amount of$275,156.00 and authorize the Mayor to execute the change order. <br /> attach: 2 <br /> cc: John A. Smith, Water Production Manager <br /> William A. Ratekin, Asst. City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.