Laserfiche WebLink
. , _. . <br /> Page 2 - • - <br /> area required to do this work basically set up because of the other work they are doing on the <br /> dam. This represents a cost savings to the City. <br /> Staff directed Osage Constructors Inc. to provide a proposal to complete the work as a <br /> ' change order to their current contract with the City. Osage submitted a proposal of$275,156.00 <br /> to do this additional work. This proposal was reviewed and considered to be representative of the <br /> work involved. Osage will have to arrange for additional equipment and material to do this work. <br /> It is recommended that City Council approve the attached resolution authorizing a change <br /> order to the City's contract with Osage Constructors Inc. for the Lake Decatur Dam <br /> Rehabilitation (City Project 8918E) for the restoration of the north and south wingwalls of the <br /> dam in the amount of$275,156.00 and authorize the Mayor to execute the change order. <br /> attach: 2 <br /> cc: John A. Smith, Water Production Manager <br /> William A. Ratekin, Asst. City Engineer <br />