Laserfiche WebLink
� <br /> � Illinois De artment '� , �� �� " ��3 <br /> p Municipal Estimate �. <br /> ' of Transportation Maintenance Costs <br /> Period from January 1, 19 % , to December 31, 19 96 Municipality City of Decatur, iliinois <br /> Estimated Cost of Maintenance Operatio�s <br /> Material,Equipmenl or Labor <br /> Maintenance Operation puanlity Unit Amount Cost ation <br /> (No:Description-Total�uantity) Item and Speci(ication Reference and Unit Cost <br /> Street Resurfacinq (Conventional) <br /> %-00000-01-Q�! Citp Project %07 Area Reflective Crack Control 99 800 SY 1.05 104 790 <br /> Bit. Concrete Surf Co se C I 2 200 TON 42.25 064 700 <br /> Levelin Binder (Machine Method) 3 200 TON 42.25 135 200 <br /> Bit. Materials RC7D/CSS-IH Pr C 4 2 0 GAL 1.00 14 200 <br /> = Bit. Materials AC20 Prime Coat 33 000 GAL 1.30 42 900 <br /> ' Prime Coat A re ate 450 TON 13.00 5 850 <br /> Pavement Removal, Surface Course 5 500 SY 7.60 41,800 <br /> Valve Box 2 EA 175.00 350 <br /> Manhole Frame & Lid T e 1 2 EA 225.00 450 <br /> Valve Box to be Ad usted As hal 150 EA 103.00 15 450 <br /> Valve Box to be Ad'usted (Concrete) 3 EA 200.00 600 <br /> Manhole to be Ad usted (As halt) 3 EA 170.00 510 <br /> Manhole to be Ad'usted (Concrete) 3 EA 185.09 555 <br /> Mixture for Cracks Joints Flan ewa s 15 TON 150.00 2 250 <br /> Street Swee in 4 75. 300 <br /> �L 1,429,905.00 <br /> Millinq & Rehabilitation - Various <br /> 96-00000-02-Ghf CitY Proiect 9608 Cold Millin 62 500 SY 1.75 109 375 <br /> Valve Boxes to be Re laced 2 EA 370.00 740 <br /> Manhole Frames & Lid e 1 CL 2 EA 585.00 1 170 <br /> Bit. Materials AC20 Prime Coat 29 670 GAL 1.30 38 571 � <br /> A re ate (Prime Coat) 60 T 13. 080 <br /> 1-3/4" (196�/SY) Bit. Conczete Surface Course C3ass I 6 290 TON 42.25 265 752 <br /> Area Reflective Crack Control 62 500 SY 1.05 65 625 <br /> Mixture for Cracks, Joints, Flan ewa 5 30 TON 150.00 4 500 <br /> Valve Box Millin 35 EA 150.00 5 250 <br /> Manhole/Catch Basin Millin 40 EA 160.00 6 400 <br /> Valve Box Ad'usted 4 EA 11 . 440 <br /> T�T� 499,903.00 <br /> Miscellaneous Traffic Siqnals TOTAL 15,0OO.00 <br /> ''_'raffic Siqnal Maintenance TOTAI, <br /> 250,0OO.00 <br /> Total Estimated Maintenance Cost 2,194,808.0 <br /> Submitted � _ , 19 96 Approved -- �v� ^ 7 �gf'� <br /> y �= � - ���f�...� <br /> Title � � Districi Engineer <br /> Submit Four (4) Copies to District Engineer <br /> BLR-8202(Rev.S'[ <br />