|
C
<br /> � '
<br /> Project............................Milling and Rehabilitation ENGINEER'S ESTIMATE DUNN COMPANY ILLINOIS VALLEY PAVING
<br /> City Project...................9608 724 N. Mercer St. P.O. Box 648
<br /> Decatur, IL 62522-1699 Decatur, IL 62525
<br /> Bid Date........................July 16, 1996
<br /> Time...............................10:30 A.M.
<br /> 5% BID BOND 5% BID BOND
<br /> Apparent Low Bidder
<br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> PRICE PRICE PRICE
<br /> Cold Millin FWM SY 80,840.00 1.65 $133,386.80 1.68 $135,811.20 1.72 $139,044.80
<br /> Cold Milling (GM) SY 15,940.00 3.00 $47,820.00 2.60 $41,444.00 2.95 $47,023.00
<br /> Valve Boxto be Re laced EA 5.00 345.00 $1,725.00 360.00 $1,800.00 350.00 $1,750.00
<br /> Manhole Frame&Lid, T I, CL EA 5.00 565.00 $2,825.00 575.00 $2,875.00 550.00 $2,750.00
<br /> Bituminous Material Prime Coat GAL 30,900.00 1.30 $40,170.00 1.30 $40,170.00 1.30 $40,170.00
<br /> Aggr ate (Prime Coat TON 170.00 13.00 $2,210.00 13.00 $2,210.00 14.00 $2,380.00
<br /> Valve Box Millin EA 50.00 135.00 $6,750.00 140.00 $7,000.00 135.00 $6,750.00
<br /> Manhole/Catch Basin Milling EA 75.00 145.00 $10,875.00 150.00 $11,250.OQ 145.00 $10,875.00
<br /> Valve Box Adjusted EA 20.00 100.00 $2,000.00 105.00 $2,100.00 110.00 $2,200.00
<br /> Bituminous Concrete Surtace Course, Class I TON 10,500.00 42.00 $441,000.00 43.50 $456,750.00 44.25 $464,625.00
<br /> Area Reflective Crack Control SY 124,759.00 1.00 $124,759.00 1.00 $124,759.00 1.05 $130,996.95
<br /> Mixture for Cracks, Joints and Flan ewa s TON 30.00 200.00 $6,000.00 150.00 $4,500.00 150.00 $4,500.00
<br /> Leveling Binder(Machine Method) TON 4,500.00 42.00 $189,000.00 43.50 $195,750.00 44.25 $199,125.00
<br /> Short Term Pavement Markin LF 4,000.00 0.20 $800.00 1.25 $5,000.00 1.00 $4,000.00
<br /> Thermoplastic Pavement Markin - Line 4 inch LF 4,000.00 0.60 $2,400.00 0.50 $2,000.00 0.50 $2,000.00
<br /> Thermo lastic Pavement Markin - Line 6 inch LF 5,000.00 0.65 $3,250.00 0.65 $3,250.00 0.70 $3,500.00
<br /> Thermoplastic Pavement Markin - Line 12 inch LF 400.00 0.80 $320.00 1.65 $660.00 1.45 $580.00
<br /> Thermoplastic Pavement Marking- Line 24 inch LF 200.00 1.00 $200.00 2.75 $550.00 2.60 $520.00
<br /> Thermoplastic Pavement Marking- Letters 8
<br /> Symbols SF 200.00 0.20 $40.00 4.10 $820.00 3.50 $700.00
<br /> TOTAL BID AS CORRECTED $1 015 530.00 1 038 699.20 1 063 489.75
<br /> Percent Over or Under ENGINEER'S ESTIMATE 2.28 4.72
<br />
|