Laserfiche WebLink
Project............................Conventional Resurfacing ENGINEER'S ESTIMATE DUNN COMPANY ILLINOIS VALLEY PAVING ~ <br /> City Project...................9607 724 N. Mercer St. P.O. Box 648 <br /> Decatur, IL 62522-1699 Decatur, IL 62525 <br /> Bid Date........................July 16, 1996 <br /> Time...............................10:15 A.M. 5°� BID BOND 5°k BID BOND <br /> Apparent Low Bidder <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE <br /> rea Reflective Crack Control SY 66,220.00 1.05 $69,531.00 1.00 $66,220.00 1.05 $69,531.00 <br /> Bituminous Concrete Surtace Course, Class I TON 13,500.00 42.00 $567,000.00 43.95 $593,325.00 44.25 $597,375.00 <br /> Levelin Binder Machine Method TON 2,200.00 42.00 $92,400.00 43.95 $96,690.00 44.25 $97,350.00 <br /> Bituminous Materials RC70/CSS-IH Prime Coat GAL 17,200.00 1.00 $17,200.00 0.95 $16,340.00 1.00 $17,200.00 <br /> Bituminous Materials AC20 Prime Coat GAL 10,500.00 1.30 $13,650.00 1.30 $13,650.00 1.30 $13,650.00 <br /> Prime Coat Aggre ate TON 450.00 13.00 $5,850.00 13.00 $5,850.00 14.00 $6,300.00 <br /> Pavement Removal Surface Course As halt SY 1,070.00 7.30 $7,811.00 8.50 $9,095.00 8.00 $8,560.00 <br /> Pavement Removal Surtace Couse (Concrete) SY 1,350.00 9.00 $12,150.00 11.25 $15,187.50 11.00 $14,850.00 <br /> Valve Box EA 2.00 175.00 $350.00 175.00 $350.00 140.00 $280.00 <br /> Manhole Frame 8 Lid, T 1 EA 2.00 225.00 $450.00 230.00 $460.00 215.00 $430.00 <br /> Valve Box to be Ad'usted (Asphalt) EA 141.00 103.00 $14,523.00 100.00 $14,100.00 105.00 $14,805.00 <br /> Valve Box to be Ad'usted Concrete EA 3.00 200.00 $600.00 220.00 $660.00 230.00 $690.00 <br /> Manhole to be Adjusted (Asphalt) EA 3.00 170.00 $510.00 165.00 $495.00 155.00 $465.00 <br /> Manhole to be Ad'usted Concrete EA 3 185.00 $555.00 200.00 $600.00 250.00 $750.00 <br /> Mixture for Cracks, Joints&Flangeways TON 30 150.00 $4,500.00 150.00 $4,500.00 150.00 $4,500.00 <br /> Crack Sealin LBS 13,400 3.10 $41,540.00 2.95 $39,530.00 3.50 $46,900.00 <br /> Short Term Pavement Marking LF 3,000 0.20 $600.00 1.25 $3,750.00 1.00 $3,000.00 <br /> Thermoplastic Pavement Marking - Line 4 inch LF 5,000 0.60 $3,000.00 0.45 $2,250.00 0.50 $2,500.00 <br /> Thermoplastic Pavement Marking - Line 6 inch LF 5,000 0.65 $3,250.00 0.65 $3,250.00 0.70 $3,500.00 <br /> Thermoplastic Pavement Marking- Line 12 inch LF 400 0.80 $320.00 1.45 $580.00 1.25 $500.00 <br /> Thermo lastic Pavement Markin - Line 24 inch LF 200 1.00 $200.00 2.45 $490.00 2.50 $500.00 <br /> hermoplastic Pavement Marking- Letters 8� <br /> S mbols SF 200 0.20 $40.00 3.85 $770.00 3.50 $700.00 <br /> TOTAL BID AS CORRECTED $856 030.00 $888 142.50 $904 336.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 3.75 5.64 <br />