Laserfiche WebLink
� � r • } �,�-�� <br /> � <br /> �F��FC C ity of Decatu r <br /> � �� <br /> V � CHANGE OR EXTRA WORK ORDER <br /> r� <br /> '�lLINO\Y <br /> No. 12 <br /> Contract No. 8918-E Project Lake Decatur Dam Improvements <br /> Kind of Work�illway Concrete Rehabilitation Date Prepared July 22, 1996 <br /> To Tom Smith Contractor Osa�e Constructors <br /> You are hereby requeated to make khe following changes from the plans or to do the tollowing extra work on your contract dated 11/21/94 <br /> A-Description of change to be made or extra work to be completed: <br /> 1. Repair the South bascule gate. <br /> 2. Remove h drautic c linder#8 Lake Decatur Dam. <br /> Y Y <br /> 3. Disassemble hydraulic cylinder#8 in Fulton, MO. <br /> 4. Reassemble Hydraulic cylinder#8 in Fulton, MO. <br />' S. Reinstall hydraulic cylinder#8 Lake Decatur Dam. <br /> B-Reason for ordering change or extra work: <br /> 1. To restore the structure and use of the South bascule gate damaged on December <br /> 15, 1995. <br /> 2-5. To determine if there is any internal damage to hydraulic cylinder#8. <br /> (Continued on reverse side) <br /> Approved � � , �9�� <br /> Y ' <br /> Receipt is acknowled o this change or extra work and the te s of settlement are hereby agreed to: <br /> A � z5 , �9q� <br /> Contractor <br />