My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-79 ACCEPTING THE PROPOSAL AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-79 ACCEPTING THE PROPOSAL AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2016 1:47:29 PM
Creation date
7/5/2016 1:47:27 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-79
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR EMERGENCY SERVICES COMMUNICATIONS TELEPHONE EQUIPMENT AND SUPPORTING SERVICES
Approved Date
7/1/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x � <br /> i ' <br /> (5) Provide a designated work area with adequate heat and �ight, and a secure <br /> storage area for equipment delivered to the PURCHASER. The PURCHASER <br /> shall be solely liable for loss or damage to equipment prior to, during and <br /> following installation when such equipment is on or within PURCHASER's <br /> facilities and/or vehicles. <br /> Section 2 SITES <br /> This agreement is predicated on the utilization of sites and site configurations, which <br /> have been selected either by the PURCHASER or by MOTOROLA as contained in the <br /> MOTOROLA proposal. In either situation, should it be determined by either MOTOROLA <br /> or PURCHASER during the course of performance on this Agreement that the sites or <br /> configuration selected are no longer available or desired, new or replacement sites or <br /> configuration will be selected and approved by both MOTOROLA and the PURCHASER. <br /> If any price adjustments are necessary as a result of these new or replacement sites, <br /> such price adjustments will be added to this Agreement by change order in accordance <br /> with Section 4 of the General Provisions. <br /> Section 3 SUBSURFACE/STRUCTURAL CONDITIONS <br /> This Agreement and the MOTOROLA proposal are predicated upon normal soil <br /> conditions defined by E.I.A. standard RS-222 (latest revision). Should MOTOROLA <br /> encounter subsurface, structural, and/or latent conditions at any site differing from those, <br /> indicated on the specifications, or as used in the preparation of the bid price, the <br /> PURCHASER will be given immediate notice of such conditions before they are further <br /> disturbed. Thereupon, MOTOROLA and the PURCHASER shall promptly investigate the <br /> conditions and, if found to be different, will adjust the plans and/or specifications as may <br /> be necessary. Any changes which cause an adjustment in the contract price or in time <br /> required for the pertormance of any part of the contract shall result in a contract <br /> modification in accordance with Section 4 of the General Provisions. <br /> Section 4 PERIOD OF PERFORMANCE <br /> A. MOTOROLA shall complete the work in accordance with the following schedule: <br /> (1) Delivery of Equipment to Segno Communications, within 8 weeks after this <br /> Agreement is executed by both parties. <br /> (2) Installation of Equipment completed within 4 weeks of Delivery to Segno <br /> Communications.. <br /> (3) Final Acceptance/Completion of Acceptance Test within 2 weeks of Installation. <br /> B. Whenever MOTOROLA knows or reasonably should know that any actual or potential <br /> condition due to circumstances beyond its control is delaying or threatens to delay <br /> the timely performance of the work, MOTOROLA shall within thirty (30) days give <br /> PURCHASER notice thereof and may request an extension of time to perform the <br /> work. <br /> Contract No. 96- /ABP 2 6/3/96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.