My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-72 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-72 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2016 2:00:56 PM
Creation date
7/5/2016 2:00:56 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-72
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT SIDEWALK CURB RAMPS FOR ADA CITY PROJECT 9627
Approved Date
6/17/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ' , <br /> Project............................Sidewalk Curb Ramps for ADA ENGINEER S ESTIMATE Christy-Foltz, Inc. Caldwell Engineering Co. <br /> City Project...................9627 740 South Main St. 500 Allen Avenue � - <br /> City of Decatur P.O. Box 828 P.O. Box 280 <br /> Engineering Division Decatur, IL 62525 Jacksonville, IL 62651 <br /> Bid Date........................June 4, 1996 <br /> Time...............................3:00 p.m. <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE <br /> Aggregate Base Course Gradation CA6 TON 5.0 25.00 125.00 55.00 275.00 920.00 4,600.00 <br /> Portland Cement Concrete Sidewalk(5 Inch) S.F. 8,540.0 5.05 43,127.00 4.00 34,160.00 4.17 35,611.80 <br /> Combination Concrete Curb&Gutter Removal and L.F. 994.0 2833 28,160.02 33.00 32,802.00 30.88 30,694.72 <br /> Re lacement <br /> Concrete Sidewalk Removal S.F. 6,850.0 2.10 14,385.00 1.00 6,850.00 2.70 18,495.00 <br /> Sawcutting L.F. 604.0 3.10 1,872.40 1.50 906.00 2.95 1,781.80 <br /> Pavement Removal-Bituminous Concrete S.Y. 86.5 8.25 713.63 8.00 692.00 36.50 3,157.25 <br /> Pavement Removal-Portland Cement Concrete S.Y. 14.6 26.25 383.25 10.00 146.00 331.45 4,839.17 <br /> Pavement Patching-Bituminous Concrete(2 Inch) S.Y. 86.5 36.05 3,118.33 20.00 1,730.00 37.70 3,261.05 <br /> Pavement Patching-Portland Cement Concrete(S inch) S.Y. 14.6 38.80 566.48 45.00 657.00 125.35 1,830.11 � <br /> Work Zone Safety Control Each 25.0 125.00 3,125.00 80.00 2,000.00 271.60 6,790.00 <br /> TOTAL BID AS CORRECTED $95 576.10 80 218.00 111 060.90 <br /> Percent Over or Under ENGINEER'S ESTIMATE 16.0 16.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.