Laserfiche WebLink
� � <br /> . -. <br /> Project............................WATERMAIN EXTENSION PROGRA Engineer's Estimate Sewer,Inc. oodmar,Inc Bodine Sewer,Inc Springfield Mechanical RJ Pawer Plumbing <br /> City Project...................9501 Box 4569 1295 St.FiNy 121 South RR2 Box 35 orporation 8 Heating Co. T <br /> Decatur,IL 62525 Mt.Zion,IL 62549 Decatur,IL 62521 00 Wirt Ave. 3117 S.Douglas Ave. <br /> r0 Box 3244 Sprin�eld,IL 62704 <br /> Bid Date........................January 18, 1996 pringfield,IL 62708-3244 <br /> Time..............................2:00 P.M. �o Bid Bond 5%Bid Bond 9�o Bid Bond %Bid Bond 5%Bid Bond <br /> •BID AS CORRECTED <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE PRICE PRICE <br /> mc . <br /> FIRE HYDRANT EXTENSION 18 inch EA 1.0 $325.00 $325.00 363.00 363.00 350.00 $350.00 325.00 325.00 425.00 425 00 345.00 345.00 <br /> FIRE HYDRAPfT EXTENSION 24 inch EA 1.0 5350.00 5350.00 393.00 393.00 375.00 5375.00 350.00 350.00 485.00 465.00 390.00 390.00 <br /> ONCRETE MEDIAN PAVEMENT(5 inch) SY 10 550.00 5500.00 H0.00 600.00 80.25 5602.50 42.00 420.00 84.00 640.00 �00.00 1,000.00 <br /> COMBINATION CONCRETE CURB 8 GUTTER LF 20 535.00 $700.00 32.00 840.00 31.50 $830.00 20.00 400.00 40.00 800.00 150.00 3,000.00 <br /> PE B9:38 <br /> OMBINATION CONCRETE CURB&GUTTER LF 18 525.00 $400.00 35.00 560.00 29.50 5472.00 18.00 288.00 41.00 658.00 150.00 2,400.00 <br /> E 88:08 <br /> TOTAL BID AS CORRECTED 5323 t78.10 2s83�5.50 3029tt.85 309850.80 330oet.80 399275.00 <br /> Percent Over or Under ENGINEER'S ESTIMA E ss s.2 a.�s 2.�a 23.55 <br /> PAGE 2 <br />