My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-86 AUTHORIZING PROFESSIONAL ENGINEERING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-86 AUTHORIZING PROFESSIONAL ENGINEERING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 9:35:55 AM
Creation date
7/8/2016 9:35:41 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-86
Res Ord Title
AUTHORIZING A PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH FARNSWORTH GROUP TO PREPARE A PRELIMINARY STORM DRAINAGE DESIGN REPORT OF 32ND / FULTON AREA CITY PROJECT 2016-04
Approved Date
7/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E�ibit A <br /> PROJECT SCOPE OF SERVICES—June 24, 2016 <br /> � City of Decatur <br /> 32"d/Fulton Ave. Drainage Review <br /> • Prepare exhibits for Public Open House#2 to present findings and recommendation to <br /> public. <br /> • Prepare Final Report and provide final CADD files. <br /> Note: 1. Not included in this Contract and Scope of Services: <br /> • Detailed topographic survey of entire 300 acre study area <br /> • Property Surveys <br /> • Roadway, Traffic, or Potable Water/Sanitary Sewer studies or design <br /> • Attendance or presentation at Planning and Zoning or City Council <br /> Meetings <br /> • Construction Documents, Bidding Assistance or Construction <br /> Administration <br /> • Preparation or Provision of GIS data of final mapping beyond Shape Files <br /> • Geophysical or Environmental Investigations <br /> • IDNR or Corps of Engineers Permitting <br /> • FEMA Letters of Map Revision or Flood Studies <br /> • IDOT Coordination or Permitting ; <br /> The items listed above could be done on a time and material basis or under a � <br /> separate contract addendum if requested at a later date by the Client. � <br /> Estimated Project Schedule: <br /> I�I <br /> ; <br /> Contract Awarded by City Council July 5, 2016 <br /> Project Kickoff July 12 , 2016 <br /> Advertise Public Open House July 14, 2016 <br /> Public Open House#1 July 21, 2016 <br /> Findings Workshop August 8, 2016 <br /> Alternatives Workshop September 5, 2016 <br /> Recommendations Workshop September 28, 2016 <br /> Advertise Public Open House October 5, 2016 <br /> Final Public Open House October 12, 2016 <br /> Draft Report/ Estimates of Cost Submitted October 26, 2016 <br /> Final Report Submitted December 28, 2016 <br /> A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.