Laserfiche WebLink
E�ibit A <br /> PROJECT SCOPE OF SERVICES—June 24, 2016 <br /> � City of Decatur <br /> 32"d/Fulton Ave. Drainage Review <br /> • Prepare exhibits for Public Open House#2 to present findings and recommendation to <br /> public. <br /> • Prepare Final Report and provide final CADD files. <br /> Note: 1. Not included in this Contract and Scope of Services: <br /> • Detailed topographic survey of entire 300 acre study area <br /> • Property Surveys <br /> • Roadway, Traffic, or Potable Water/Sanitary Sewer studies or design <br /> • Attendance or presentation at Planning and Zoning or City Council <br /> Meetings <br /> • Construction Documents, Bidding Assistance or Construction <br /> Administration <br /> • Preparation or Provision of GIS data of final mapping beyond Shape Files <br /> • Geophysical or Environmental Investigations <br /> • IDNR or Corps of Engineers Permitting <br /> • FEMA Letters of Map Revision or Flood Studies <br /> • IDOT Coordination or Permitting ; <br /> The items listed above could be done on a time and material basis or under a � <br /> separate contract addendum if requested at a later date by the Client. � <br /> Estimated Project Schedule: <br /> I�I <br /> ; <br /> Contract Awarded by City Council July 5, 2016 <br /> Project Kickoff July 12 , 2016 <br /> Advertise Public Open House July 14, 2016 <br /> Public Open House#1 July 21, 2016 <br /> Findings Workshop August 8, 2016 <br /> Alternatives Workshop September 5, 2016 <br /> Recommendations Workshop September 28, 2016 <br /> Advertise Public Open House October 5, 2016 <br /> Final Public Open House October 12, 2016 <br /> Draft Report/ Estimates of Cost Submitted October 26, 2016 <br /> Final Report Submitted December 28, 2016 <br /> A-2 <br />