My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-162 ACCEPTING THE PROPOSAL AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-162 ACCEPTING THE PROPOSAL AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 1:00:17 PM
Creation date
7/8/2016 1:00:14 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-162
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR EMERGENCY SERVICES COMMUNICATIONS HARDWARE AND SUPPORTING EQUIPMENT AND SERVICES
Approved Date
11/6/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �� = ' V" � <br /> M MOTOROLA <br /> EXHIBIT C <br /> STATEMENT OF WORK <br /> SCOPE OF WORK <br /> FOR THE INSTALLATION OF THE RADIO CONSOLE EQUIPMENT <br /> FOR CITY/COUNTY DISPATCH CENTER <br /> Purpose: <br /> The purpose of this Statement of Work is to provide a description of the work to be <br /> performed by Motorola. <br /> In order for Motorola to implement the proposed system on schedule it shall be the <br /> responsibility of the purchaser to perform and provide the Customer Responsibilities <br /> Listed. <br /> Motorola Responsibilities: <br /> Install a six (6) position CRT Console. <br /> Increase the size of the CEB <br /> Provide parallel operation of old console and new console until change over is complete. <br /> Re-install the existing console position for ESDA. <br /> Remove all old console equipment. <br /> Upon notification from the City that required building cables, AC power and wiring needs <br /> have been completed work will be scheduled to begin within five (5) working days. <br /> Work will be done during the normal working hours of 8:30 AM and$:30 PM, Monday <br /> through Friday excluding holidays. <br /> Test and optimize system according to the Acceptance Test Plan. <br /> Customer Responsibilities: <br /> The customer shall be liable for any customer related delays. <br /> New surface furniture installation is not part of this installation procedure.All in building <br /> cables, wire raceways,AC power and wiring will be provided by the customer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.