Laserfiche WebLink
� �� = ' V" � <br /> M MOTOROLA <br /> EXHIBIT C <br /> STATEMENT OF WORK <br /> SCOPE OF WORK <br /> FOR THE INSTALLATION OF THE RADIO CONSOLE EQUIPMENT <br /> FOR CITY/COUNTY DISPATCH CENTER <br /> Purpose: <br /> The purpose of this Statement of Work is to provide a description of the work to be <br /> performed by Motorola. <br /> In order for Motorola to implement the proposed system on schedule it shall be the <br /> responsibility of the purchaser to perform and provide the Customer Responsibilities <br /> Listed. <br /> Motorola Responsibilities: <br /> Install a six (6) position CRT Console. <br /> Increase the size of the CEB <br /> Provide parallel operation of old console and new console until change over is complete. <br /> Re-install the existing console position for ESDA. <br /> Remove all old console equipment. <br /> Upon notification from the City that required building cables, AC power and wiring needs <br /> have been completed work will be scheduled to begin within five (5) working days. <br /> Work will be done during the normal working hours of 8:30 AM and$:30 PM, Monday <br /> through Friday excluding holidays. <br /> Test and optimize system according to the Acceptance Test Plan. <br /> Customer Responsibilities: <br /> The customer shall be liable for any customer related delays. <br /> New surface furniture installation is not part of this installation procedure.All in building <br /> cables, wire raceways,AC power and wiring will be provided by the customer. <br />