My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-147 AUTHORIZING THE PROPOSAL AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-147 AUTHORIZING THE PROPOSAL AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 1:35:06 PM
Creation date
7/8/2016 1:35:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-147
Res Ord Title
AUTHORIZING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF A CONTRACT LOWER BROADWAY SEWER REHABILITATION PROJECT CITY PROJECT 9519
Approved Date
10/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT FOR ENGINEERING SERVICES <br /> FOR THE <br /> CITY OF DECATUR <br /> REHABILITATION OF THE LOWER BROADWAY SEWER <br /> I��' <br /> TffiS AGREEMENT,made and entered into thi�day of October, 1995 by and between <br /> the CI1'Y OF DECA1'LTR,II.LINOIS, hereinafter referred to as the "CI7'Y" and BAINBRIDGE, <br /> GEE,NIILANSKI&ASSOG7ATES,INC., 1670 South Taylorville Road, Decatur, Illinois 62521, <br /> hereinafter referred to as the"ENGINEER", covers professional engineering services in connection <br /> with the preparation of rehabilitation documents for the 84-inch Lower Broadway Sewer and <br /> construction supervision and resident inspection of the improvements (if so directed by the CTTY), <br /> hereinafter referred to as the"PROJECT". <br /> Said PROJECT, commencing at the intersection of Prairie Street and Martin Luther King <br /> Jr. Drive, extends southwesterly approximately 2700 feet to the Broadway Diversion Structure No. <br /> 6, and has been designated CITY PROJECT 9519. <br /> THEREFORE, in consideration of these premises and of the mutual covenants herein set <br /> forth, <br /> THE ENGINEER AGREES: <br /> 1. Bv-nass Facilities - To perform or be responsible for the performance of the following <br /> engineering services in connection with flow by-pass facilities when so directed by the CTTI'. <br /> a. Make such detailed surveys as are necessary for the preparation of detailed <br /> construction plans of reusable by-pass facilities. <br /> b. Obtain on behalf of the CTI'Y, all required approvals and permits from applicable <br /> regulatory agencies. <br /> c. Prepare detailed construction drawings for the by-pass facilities. <br /> d. Prepare detailed specifications and contract bidding documents, ie. PROJECT <br /> MANUAL for the by-pass facilities. Said PROJECT MANUAL to contain as a <br /> minimum the following sections: <br /> Officials <br /> Index <br /> Advertisement for Bids <br /> Instructions to Bidders <br /> Contractor's Proposal <br /> Non-Collusion Af�davit <br /> BGM 95050 Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.