My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-147 AUTHORIZING THE PROPOSAL AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-147 AUTHORIZING THE PROPOSAL AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 1:35:06 PM
Creation date
7/8/2016 1:35:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-147
Res Ord Title
AUTHORIZING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF A CONTRACT LOWER BROADWAY SEWER REHABILITATION PROJECT CITY PROJECT 9519
Approved Date
10/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidder's Proof of Responsibility <br /> Ageement <br /> Performance-Payment Bond <br /> General Conditions <br /> Special Conditions <br /> Prevailing Wage Rates <br /> Equal Employment Conditions <br /> Standards <br /> Detailed Specifications <br /> e. Prepaze detailed estimate of construction cost based on final plans and documents. <br /> f. Furnish ten (10) copies of the detailed construction drawings and PROJECT <br /> MANUAL. Additional sets sha11 be furnished, upon request, at the actual cost of <br /> preparing and delivering same. <br /> g. Assist the CITY in receipt of bids and in the tabulation and interpretation of the <br /> Contractor's Proposal. <br /> h. Provide construction guidance and resident inspection services during the <br /> constiuction of the by-pass facilities. Said services are as described in Sections 4 and <br /> 5 of THE ENGINEER AGREES. <br /> 2. Design Concept Report - To perform the following engineering services in the preparation <br /> of a report recommending a rehabilitation strategy. <br /> a. Perform an internal survey of the sewer and manholes contained within the limits of <br /> the PROJECT area. <br /> b. Quantify all defects noted during the internal survey as to severity and exact location. <br /> c. Prepare a VHS format videotape of the internal inspection. Said videotape to be of <br /> such quality that defects are readily depicted and locateable. <br /> d. Perform or be responsible for the performance of laboratory and field testing to <br /> ascertain pH, temperature, hydrogen sulfide content, velocity and flow rate of the <br /> e$luent within the PROJECT. <br /> e. Review available infotmation about the sewer including condition surveys, reports, <br /> etc. <br /> f. Assess current in-line rehabilitation technology as to project applicability and <br /> constructability in order to achieve an estimated design life of 50 years based on <br /> cunent conditions. <br /> BGM 95050 Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.