Laserfiche WebLink
Project............................Grays Lane and <br /> Forest Knolls Pum Station Rehabilitations En ineer's Estlmate S rin field Mechanical Co . Goodmar,Inc. Burdick Plumbing <br /> 900 Wirt Ave.,P.O.Box 3244 1295 State Hwy.So. &Heatin Co.,Inc. <br /> City Project...................9126 Phillip Cochran, P.E. Springfieid,IL 62708-3244 Mt.Zion,IL 62549 728 South Main St. <br /> Consulting Engineer P.O.Box 496 <br /> 2602 North Morgan (217)864-3553 Decatur,IL 62525-0496 <br /> Bid Date........................September 7, 1995 Decatur, IL 62526 <br /> Time...............................3:00 p.m. <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE � PRICE <br /> "Sanitary Sewer L.F. 15 80.00 1,200.00 85.00 1,275.00 50.00 750. 0 2 .00 375.00 <br /> 4"Ductile Iron Forcemain L.F. 64 $50.00 $3,200.00 60.00 3,840.00 100.00 6,400.00 22.00 1,408.00 <br /> 4'Diameter Manhole EACH 1 $2,200.00 $2,200.00 3400.00 3,400.00 2000.00 2,000.00 2000.00 2,000.00 <br /> Pump Station-Grays Lane(Includes pumps, <br /> guide rails,liftchains,ductile iron piping and <br /> fdtings,valves,vaNe vauft, alarms,control <br /> panels,float switches,vents, precast concrete _ <br /> sections, access covers,site restoration <br /> seeding, mu�hing and all other items for <br /> complete restoration, including all temporary <br /> pumping to maintain full services.) L.S. 1 62,000.00 $62,000.00 65500.00 65,500.00 65050.00 65,050.00 88997.00 88,997.00 <br /> Pump Station-Forest Knolls(Includes pumps, <br /> guide rails,liftchains, ductile iron piping and <br /> fittings,valves,valve vauft,alarms,control <br /> panels,float switches,vents,precast concrete <br /> sections,access covers,site restoration <br /> seeding, mulching and all other ftems for <br /> complete restoration,including all temporary <br /> pumping to maintain full services.) L.S. 1 65,000.00 $65,000.00 69800.00 69,800.00 65960.00 65,960.00 85000.00 85,000.00 <br /> 5"P.C. Sidewalk S.F. 80 $6.00 $480.00 4.50 360.00 10.00 800.00 10.00 800.00 <br /> Existing Pump Station Removal-Grays Lane L.S. 1 $7,000.00 $7,000.00 3500.00 3,500.00 20000.00 20,000.00 8500.00 8,500.00 <br /> Existing Pump Station Removal-Forest Knolls L.S. 1 $2,000.00 $2,000.00 3100.00 3,100.00 10000.00 10,000.00 3500.00 3,500.00 <br /> Pavement Removal and Replacement S.Y. 14 $75.00 $1,050.00 110.00 1,540.00 50.00 700.00 30.00 420.00 <br /> TOTAL BID AS CORRECTED $144 130.00 152 315.00 171 660.00 191 000.00 <br /> Percent Over or Under NGIN R'S STI E 5.68 19.1 2.52 <br />