My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-120 AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-120 AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 2:56:25 PM
Creation date
7/8/2016 2:56:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-120
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES
Approved Date
8/21/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Swanson 2 August 2, 1995 <br /> C. To provide all survey information and resul�s on a disc formatted <br /> using AutoCad Release 12. <br /> D. Provide field monumentation of all final right of way acquisitions <br /> as well as identify all loca�cions of the same points in a temporary <br /> manner during right of way negotiations. <br /> E. Right of Way Document Preparation: <br /> 1 . Prepare a Right of Way Strip htap identifying all parcel oe��ners, <br /> addresses and parcel Tax I.D. Numbers. <br /> 2. Prepare all Right of Way Plats for all proposed takings af�cer <br /> the City of Decatur has prepared final alignments of roadways. <br /> 3. Prepare the legal descriptions for all parcels for the use by <br /> the City in preparing the Right of Way Documents and deeds. <br /> 4. All work shall be done in accordance ��ith the requirements of the <br /> State of Illinois and as per the recognized professional standards. <br /> 5. H11 work will be done a�� the direction of a Registered Professional <br /> Land Surveyor. <br /> F. To complete all items of work outlined in Sections A-C above within <br /> �wo weeks of the Notice to Proceed. <br /> G. To complete all items of work outlined in Section E within two weeks of <br /> �he receipt of the City of Decatur's Street alignment. <br /> H. To complete all items of work outlined in Section D fvithin 3 weeks of <br /> notification by the City of Decatur to do so. <br /> I. Basis of Payment: <br /> 1 . To complete all work detailed herein at a fee noi to exceed $22,5UO.OU. <br /> 2. To invoice the City of Decatur on a time and expense basis to be com- <br /> puted at the technical payroll cost to PWC times a multiplier of <br /> 1 .92. Technical payroll is defined as the direct productive salary <br /> cost for time directly chargeable to the project plus fringe benefits <br /> and payroll burden. Reimbursement of expenses and costs incurred <br /> include stakes, lath, concrete monuments, blue-prints, supplies and <br /> transportation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.