Laserfiche WebLink
I <br /> Project............................27th&Pershing Road Treffic Signals NGINEER'S ESTIMATE RATHJE ENTERPRISES EGIZII ELECTRIC,INC. J.F.EDWARDS � <br /> City Project....................9518 DBA Bodine Elechic of 700 N.MacArthur Blvd. CONSTRUCI'ION CO. <br /> Decatur Springfield,IL 62702 220 S.Clvcago St <br /> 1845 N.22nd ST. Geneseo,IL 61254 <br /> Bid Date.........................July 7, 1995 P.O.Box 976 309/944-4681 <br /> Decatur,IL 62525 <br /> Time...............................10:00 a.m. I <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE <br /> Signal head,Polycarbonate,1-Face,3-Sec6on Mast <br /> AtmMounted Each 8.0 700.00 5,600.00 766.27 6,130.16 795.85 6,366.80 737.00 5,896.00 <br /> Traffic Signal Backplate Each 8.0 70.00 560.00 65.73 525.84 53.35 426.80 40.00 320.00 <br /> Steel Mast Arm Assetnbly and Pole 38 ft. Each 1.0 2100.00 2,100.00 2217.06 2,217.06 2345.20 2,345.20 2251.00 2,251.00 <br /> Steel Mast Artn Assembly and Pole 40 ft. Each 1.0 2500.00 2,500.00 2268.84 2,268.84 2385.90 2,385.90 2261.00 2,261.00 <br /> Steel Mast Artn Assembly and Pole 44 R. Each 2.0 2900.00 5,800.00 2506.46 5,012.92 2671.90 5,343.80 2376.00 4,752.00 <br /> Full-actuated C�troller,Standard Seq.IV 8-Phases, <br /> In Type IV Cabinet Each 1.0 6000.00 6,000.00 5884.91 5,884.91 6468.00 6,468.00 6337.00 6,337.00 <br /> Rack Mounted Induc6on Loop Detector Amplifier Each 18.0 110.00 1,980.00 84.04 1,512.72 80.69 1,452.42 82.00 1,476.00 <br /> Detector Loop,Type I L.F. 2,232.0 9.00 20,088.00 6.09 13,592.88 6.51 14,530.32 8.30 18,525.60 <br /> PVC Conduit in Trench 1-1/2" L.F. 821.0 6.00 4,926.00 4.68 3,842.28 4.60 3,776.60 3.88 3,185.48 <br /> PVC Conduit in Trench 2" L.F. 96.0 8.00 768.00 7.�7 745.92 6.30 604.80 5.20 499.20 <br /> PVC Conduit in Trench 3" L.F. 50.0 10.00 500.00 8.45 422.50 8.48 424.00 8.39 419.50 <br /> PVC Conduit,Augered 1-1/2" L.F. 84.0 12.50 1,050.00 8.86 744.24 10.34 868.56 8.69 729.96 <br /> PVC Cmiduit,Augered 3" L.F. 291.0 14.50 4,219.50 11.09 3,227.19 12.61 3,669.51 12.59 3,663.69 <br /> Elechic Cable in Conduit,No.14 5/C L.F. 1,107.0 J 1.00 1,107.00 0.70 774.90 0.83 918.81 0.64 708.48 <br /> Electric Cable in Conduit,No.18,3-Pair <br /> Twisted-Shielded L.F. 3,171.0 1.00 3,171.00 0.65 2,061.15 0.76 2,409.96 0.56 1,775.76 <br /> Electric Cable in Condui�No.6 1/C L.F. 44.0 2.50 110.00 1.42 62.48 1.94 85.36 0.73 32.12 <br /> Concrete Founda6on,Type D L.F. 3.5 260.00 910.00 199.20 697.20 238.15 833.53 324.00 1,134.00 <br /> Concrete Foundation,TypeE,30"Dia. L.F. 44.0 110.00 4,840.00 97.94 4,309.36 90.55 3,984.20 101.00 4,444.00 <br /> Concrete Handhole Each 5.0 900.00 4,500.00 748.83 3,744.15 854.70 4,273.50 745.00 3,725.00 <br /> Concrete Double Handhole Each 1.0 1300.00 1,300.00 979.91 979.91 1453.10 1,453.10 1520.00 1,520.00 <br /> Gulfbox Junction Each 6.0 290.00 1,740.00 231.08 1,386.48 276.65 1,659.90 304.00 1,824.00 <br /> Trench and Backfill L.F. 967.0 3.00 2,901.00 2.53 2,446.51 1.74 1,682.58 4.91 4,747.97 <br /> Remove Existing Traffic Sig�al L.S. 1.0 2000.00 2,000.00 1286.20 1,286.20 1709.40 1,709.40 866.00 866.00 <br /> Traffic Control a�Protectioq U-3 L.S. 1.0 1500.00 1,500.00 475.24 475.24 550.00 550.00 180.00 I80.00 <br /> Traffic Control�Protection,U-4 L.S. 1 1500.00 1,500.00 475.24 475.24 1100.00 1,100.00 180.00 180.00 <br /> Wood Pole,35 ft.,Class 4 Each 1 600.00 600.00 376.05 376.05 529.10 529.10 250.00 250.00 <br /> Service Installation,Type B Each 1 250.00 250.00 726.38 72638 435.60 435.60 725.00 725.00 <br /> Median Removal S.F. 452 5.00 2,260.00 6.00 2,712.00 3.25 1,469.00 1.90 858.80 <br /> P.C.Concrete Pavement,10" S.Y. 50 60.00 3,000.00 75.00 3,750.00 40.37 2,018.50 56.80 2,840.00 <br /> Curb and Gutter Removat L.F. 171 I5.00 2,565.00 9.00 1,539.00 6.49 1,109.79 4.70 803.70 <br /> TOTAL BID AS CORRECTED 90 345.50 73 929.71 74 885.04 76 931.26 <br /> Percent Over or nder ENGINEER'S ESTIMATE 18.17 17.11 14.85 <br />