Laserfiche WebLink
Project............................ City Project 9410 NGINEER'S ESTIMATE DEMENT EXCAVATING � <br /> Storm Sewer 5205 YAVAPAI <br /> Improvements DECATUR, IL 62526 , <br /> Bid Date........................... June 20, 1995 <br /> Time............................... 3:00 p.m. <br /> PAY ITEM iTNIT QTY LTNIT TOTAL iJNIT TOTAL <br /> PRICE PRICE <br /> REMOVAL CONCRETE CURB & GUTTER LF 50 3.00 150.00 7.15 357.50 <br /> PAVEMENT REPLACEMENT -PORTLAND <br /> CEMENT CONCRETE DRIVEWAY, 6-INCH SY 70 45.00 3,150.00 32.17 2,251.90 <br /> PAVEMENT REPLACEMENT -BITLJMINOUS <br /> CONCRETE SURFACE COURSE, CLASS I TON 40 120.00 4,800.00 148.00 5,920.00 <br /> STORM SEWERS - CORRUGATED METAL <br /> PIPE(12-INCH DIAMETER) LF 760 20.00 15,200.00 16.50 12,540.00 <br /> STORM SEWERS -REINFORCED CONCRETE <br /> PIPE (12-INCH DIAMETER) LF 20 35.00 700.00 132.00 2,640.00 <br /> TRENCH BACKFII,L TON 100 36.00 3,600.00 7.48 748.00 <br /> PIPE LTNDERDRAIN(6-INCH DIAMETER) LF 1,000 15.00 15,000.00 14.96 14,960.00 <br /> UNDERDRAIN SERVICE CONNECTION <br /> (1.5-INCH& 2-INCH DIAMETER) EA 12 50.00 600.00 14.30 171.60 <br /> CLEANOIJT EA 4 75.00 300.00 14.30 57.20 <br /> INLET - TYPE A WITH NEW FRAME AND <br /> GRATE, TYPE 8 EA 7 500.00 3,500.00 222.20 1,555.40 <br /> INLET - TYPE A WITH NEW FRAME AND � <br /> GRATE, TYPE II SPECIAL EA 4 500.00 2,000.00 369.00 1,476.00 <br /> CONCRETE CROSSPAN(7-INCI-n SY 40 60.00 2,400.00 26.12 1,044.80 <br /> CONCRETE CURB AND GUTTER LF 50 22.00 1,100.00 12.76 638.00 <br /> TOTAL BID (AS CORRECTED) 52 500.00 44 360.40 <br /> Percent Over or(Under)ENGINEER'S ESTIMAT (15.50 <br />