Laserfiche WebLink
ARTICLE 4 <br /> CONTRACT SUM <br /> 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Concract Sum of <br /> Ninety—Six Thousand Six Hundred Sixty—Five and no/100------------------Dotlars <br /> (�*96,665.00* ), subject to additions and deductions as provided in the Con- <br /> tract Documencs. <br /> 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br /> hereby accepted by the Owner: <br /> (State tbe numbers or other identification oJaccepted alternates./j deasions on other a[ternates are to be mude hy tbe Ou�ner subsequent to the erecutron of <br /> this Agreement, attacb a schedule of sucb other a/ternates sbowing the umount jor each and the date unti!which tbul amoun!is t�alyd.) <br /> Base Bid $88,888.00 <br /> Alt. No. 1 7,777.00 <br /> Total Contract $96,665.00 <br /> 4.3 Unit prices, if any, are as follows: <br /> N/A <br /> • • TWELFTH EDITION • AIA° • O1 87 <br /> A I A D O C U M E N T A 1 0 1 O W N E R-C O N T R A C T O R A G R E E M E N T 9 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.20006 A 1 0 1-�9ST 3 <br /> WARNlNG:UnUcensed photocopying violates U.S.copyright laws and is subject to legal prosecution. <br />