My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-28 AUTHORIZING THE EXECUTION OF A CHANGE ORDER
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-28 AUTHORIZING THE EXECUTION OF A CHANGE ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 9:44:05 AM
Creation date
7/12/2016 9:44:05 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-28
Res Ord Title
AUTHORIZING THE EXECUTION OF A CHANGE ORDER CITY PROJECT 8918-E LAKE DECATUR DAM CONCRETE SPILLWAY REHABILITATION
Approved Date
3/20/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE/WORK ORDER NO. 2 <br /> C- Settlement for cost of work to be made as follows: <br /> Attached to this change order is a letter of understanding dated February 1, 1995, from the contractor to <br /> Federated Insurance,ATT'N: Dick Siefers,which provides the description of the work proposed and the <br /> basis for the costs to repair the South bascule gate. <br /> The letter also identifies unit prices for the additional work. This change order accepts these unit prices as <br /> the basis for future payment by change order. <br /> D- ITEMS INCLUDED IN CONTRACT <br /> Item No. Item Description Unit Price Quantity Amount <br /> Total <br /> E- ITEMS NOT INCLUDED IN CONTRACT <br /> Item No. Item Description Unit Price Quantity Amount <br /> 1 Shop drawing preparation, Engineering and Field L.S. 1 9,800 <br /> Measurements. _ <br /> 2 Cofferdam redesign,fabrication and installation L.S. 1 63,200 <br /> 3 Remove gate leafs and saddles. L.S. 1 80,200 <br /> 4 Purchase steel for new bascule gate. L.S. 1 38,000 <br /> 5 Fabricate bascule gate. L.S. 1 76,492 <br /> 6 Install bascule gate and supports. L.S. 1 111,434 <br /> � <br /> Total 5379.126 <br /> Amount of original contract: $2.642.490 <br /> Net Change to date: _$ 379.126 Percent of contract price: 14.3 % <br />
The URL can be used to link to this page
Your browser does not support the video tag.