My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-14 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-14 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 10:31:34 AM
Creation date
7/12/2016 10:30:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-14
Res Ord Title
AUTHORIZING AGREEMENT FOR LAKE SHORE DRIVE RELOCATION FEASIBILITY STUDY CITY PROJECT MF-9436
Approved Date
2/6/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ����°E�,�. DECATUR, ILLINOIS <br /> � <br /> V A <br /> � Lalce Shore Driue Relocation Study <br /> ��«�� <br /> � <br /> � � ., . �vr ..�_ ,� <br /> ��s. �:z <br /> L� `'� � ' �,� ��F <br /> g, �• 4' m,�. ����iy^,� � <br /> �- �; .�r ��1'I1��1.Y.'E,�,',.f.::. <br /> Intersection A B C D E F G H I J <br /> � Main&Eldorado C C C D C C C C C C <br /> Franklin&Eldorado C C C F C C C C C C <br /> � Main&Wood B B C C B C C C C C <br /> Franklin&Wood C C C C C C C C C C <br /> � Main& X X X B X D D C B D <br /> Cleveland/Marion <br /> Franklin& X X X B X C C B B C <br /> Cleveland/Marion <br /> � 22nd&Eldorado C C C E C D D D D D <br /> 22nd&Cantreli C C C C C C C C C C <br /> , Lake Shore&Jasper B B B B B B B B B B <br /> Lake Shore&16th D D D C D C C C C C <br /> � Total Peak Hour Delay 91.7 90.6 94.6 271.5 90.6 132.0 144.6 129.8 116.1 131.9 <br /> X =Not Applicable <br /> ' <br /> The results of the capacity analysis reveals that when level-of-service for all the major intersections <br /> � affected by the alternatives are considered,total vehicle delay increases from existing conditions for <br /> all alternatives except B and E. The decrease in delay under Alternatives B or E amounts to less than <br /> $1,000 per year benefit in fuel consumption reduction. <br /> � A review of the traffic assignments and capacity analysis also revealed that under scenarios F <br /> through J, sufficient traffic could be diverted from Lake Shore Drive to be accommodated by one <br /> � through lane in each direction on Lake Shore Drive, with auxiliary turn lanes at signalized <br /> intersections. The additional existing pavement width could then be turned to pedestrian or bicycle <br /> purposes. The results of the capacity analysis for changed roadway cross section template follows: <br /> ' g <br /> _dA. <br /> � Intersection F G H x I J <br /> 22nd and Cantrell C C C C C <br /> � Lake Shore&jasper B B B B B <br /> Lake Shore &16th D D D D D <br /> ' � <br /> Bucher, Willis£�Ratliff-21 i <br /> � r�rs�vnwrc�uroxmr.�roRT,wrb I,I <br />
The URL can be used to link to this page
Your browser does not support the video tag.