My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R94-161 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1994
>
R94-161 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 3:08:39 PM
Creation date
7/12/2016 3:08:39 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R94-161
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF CONTRACT COMMUNITY DEVELOPMENT BLOCK GRANT PROJECT GALLERY 510 / 510 WEST DECATUR STREET
Approved Date
10/17/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. '\l � <br /> *SPECIFIED LAB OR <br /> � INS TALLED <br /> An installation team will arrive on jobsite after the unit � <br /> arrives from factory. Labor includes moving the unit, '. <br /> to installation area. Coordination with site personnel in • <br /> the� actual placement of the equipment, setting the unit � : <br /> in place, verif yin g s pace re quirements, and anchorin g t h e : <br /> unit. Once the unit is in place, the team will coordinate . <br /> with electrician, drywall team, etc. to finish lift area if <br /> necessary. Once area is finished, lift team will make . <br /> adjustments to make lift installation complete. Lift -_ ;:, . <br /> team wi l l a lso coor dinate with general contractor, the_ . �,.�� <br /> removal of rubbish and debris from area. A more detailed <br /> description of installation will be provided in scope of ., - <br /> work to be received after acceptance of proposaL <br /> INS TALLA TION AD VISOR - � <br /> A factory trained installation advisor will be assigned to '' <br /> your jobsite for a period of 4 days (Wed — Sat). He will �', <br /> coordinate your staff on the installation of your lift. �Ie I <br /> will train your staff on proper method of installation. ' The il <br /> uidelines that he will use will be based solely on ANSI � <br /> �American National Standards Institute uidelines. He <br /> ) g <br /> will be the coordinator between your staff and the <br /> electrician, drywall team, etc. He will come equipped <br /> with replacement parts, diagrams, etc. to resolve any <br /> problems that may occur. His arrival will be after the <br /> lift has been shipped to site by the factory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.