My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R94-31 FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY
COD
>
City Clerk
>
RESOLUTIONS
>
1994
>
R94-31 FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 10:23:08 AM
Creation date
7/14/2016 10:23:07 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R94-31
Res Ord Title
FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
Approved Date
3/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> _ ���It10LS �epat�t1l�ilt � ' Municipal Estimate o <br /> _ of Transportation Maintenance Costs <br /> Period from January 1, 19 94 ,to December 31, 19 94 Municipality City of Decatur, Illinois <br /> Estimated Cost of Maintenance Operations <br /> Maintenance Operation Malerial,Equipment or Labor Operation <br /> (No.-Descriplion-Total Quantily) item and Specification Reference �uantily Unit Amount Cost <br /> and Unit Cost <br /> old Mix Recycling 9q- 00000-01GM Bituminous Materials (Acnhalt F.miilcinnl 16,100 Gals 1.20 19 320.0 <br /> City Froject 9405 HFRA Em�,tlsion RejnvPnat�r 41 700 Gals 1.85 77 145.0 <br /> A re ate 5 000 Tons 14.55 72 750.0 <br /> Base Construction 49 840 S.Y. 1.20 59 808.0 <br /> Base Re air 0 S Y 11 _ <br /> Incidental CA6 50 Tons 27.00 1 350.0 <br /> Grader and 0 erator 85 Hours 93.00 7,905.0 <br /> TOTAL 241,683.00 <br /> Street Resurfacinq (Conventional) Area Reflective Crack C n r 40 740 S.Y. .95 38 703.0 <br /> 94-00000-02GM City Project 9407 Bit. Concrete Surface Course Class I 12 4 0 T 39.00 483 600.0 <br /> Levelinq Binder (Machine Method) • 800 Tons 39.00 31 200.0 <br /> Bit. Materials RC70/CSS-IH Prime Coat 8 000 Gals. .90 7 200.0 <br /> Bit. Materials AC85/100 Prime Coat 12 220.Gals 1.20 14 664.0 <br /> Prime Coat Aqqreqate 220 Tons 12.40 2 72g p <br /> avement Removal, Surface Course 2 000 S.Y. 7.20 14 400.0 <br /> alve Box 3 Each 160.00 480.0 <br /> anhole Frame & Lid T e 1 3 Each 215.00 645.0 <br /> alve Box to be Adjusted (Asphalt) 125 Each 93.00 1 6 <br /> alve Box to be Adjusted (Concrete) 3 Each 190.00 570.0 <br /> anhole to be Ad'usted (As halt) 1 0.00 480.0 <br /> anhole to be Adjusted (Concrete) 3 Each 175.00 • 525.0 <br /> ixture for Crack, Joints, Flangeways 10 Tons 150.00 1 500.0 <br /> � TOTAL 608,320.00 <br /> Miliinq & Rehabilitation - Various old Millin 1 50 57 690.0 <br /> City Project 9408 94-Gooao-Oa-6M alve Boxes to be Re laced 3 Each 335.00 1 005.0 <br /> anhole Frames & Lid T e 1 CL 3 Each 560.00 1 680.0 <br /> ituminous Materials AC85/100 Prime 11 550 Gals. 1.20 13,860.0 <br /> ggregate (Prime Coat) 100 Tons 12.40 1 240.0 <br /> it.�Concrete Surface Course Class I g 39.00 168 090.0 <br /> rea Reflective Crack Control 34 4.0 � <br /> ixture for Cracks Joints Flan ewa s <br /> alve Box Millinq 41 Each 125.00 5.125.0 <br /> anhole/Catch Basin Mill n 52 Each 135.00 7 020.0 <br /> ' alve Box Ad'usted E . 90.00 540.0 <br /> � -� TOTAL 295.364.00 <br /> Miscellaneous Traffic Siqnals TOTAL 10,000.00 <br /> Traffic SiQrial Maintenance TOTAL 288�00.00 <br /> Traffic Signal Controllers and <br /> Cabinets - City Project 9402 <br /> 94-00000-04GM � - � TOTAL 72,0(�:00 <br /> A <br /> Totai Eslimated Maintenance Cost 1,515,367.00 <br /> Submitt-g M cn 2i `' '� 94 •Approved 3?i3 � 19 94 <br /> L' �' �� l►�� <br /> BY ,� Mayor ! <br /> `tviunicipal ficial Tiile District Engineer <br /> Submit Four(4) Copies to District Engineer <br /> • ' BLR-8202(Rev.5/F <br />
The URL can be used to link to this page
Your browser does not support the video tag.