My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-175A AUTHORIZING AGREEMENT IDOT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-175A AUTHORIZING AGREEMENT IDOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 1:37:15 PM
Creation date
7/14/2016 1:37:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-175A
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS DEPARTMENT OF TRANSPORTATION U.S. ROUTE 51 BUSINESS, MAIN STREET WITH GREEN STREET AND GARFIELD AVENUE
Approved Date
12/6/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> F.A.P. Route 710 <br /> Section (50Z-2)TS-2 & (50Z-3)TS-5 <br /> City of Decatur <br /> Macon County <br /> Agreement No. JN-593011 <br /> Contract No. 90558 <br /> C-95-064-93 <br /> 3. It is mutually agreed by and between the parties hereto that the <br /> estimated cost and cost proration of the improvement, based on 90� <br /> Federal funding, is as follows: <br /> Federal State City <br /> Ty e of Work Cost % Cost % Cost � Total <br /> cons , costs — <br /> excluding the following $198,000 90 $ 11 ,000 5 $11 ,000 5 $220,000 <br /> �uminaires � w;ring <br /> for highway lighting, <br /> requested by the City, <br /> on combination mast � <br /> arms at Garfield Avenue NA NA $2,000 100 $ 2,000 <br /> Sub Total $198,000 $ 11 ,000 $13,000 $222,000 <br /> I P&C En r. 15% � 1 ,950 $ 1 ,950 <br /> 9 <br /> Total $198,000 $ 11 ,000 $14,950 �223,950 <br /> Participation and reimbursement shall be predicated on the percentages shown <br /> above for the specified work. Cost shall be determined by multiplying the <br /> final quantities times contract unit prices plus 15� for construction and <br /> preliminary engineering. Participation toward the traffic signals shown above <br /> shall not exceed $15,812 which represents 125% of their estimated construction <br /> and engineering costs. <br /> 4. The CITY has passed a resolution appropriating sufficient funds to pay <br /> its share of the cost of this improvement, a copy of which is attached <br /> hereto as "Exhibit C" and made a part hereof aJnd will p/�ass a supplemental <br /> ~ .Ci^,'w v vn T^ +�1r""�A 1 7� 1 m/�IIS�1+ NI� y�\ }Qyµ ?y 1 nJ IT�7/.7 Yl'�' �/� /�I!\ION <br /> 1 � Vi � il 1 i M'iG �1 Y��1�� �IIIVI{.�V �rJ�� V}ii la'S. L ' iiC �{ 9 ii� � i4 vV .�ii• . <br /> their final costs. <br /> 5. The CITY agrees to provide, prior to the STATE'S advertising for the work <br /> to be performed hereunder, approval of the plans and specifications as <br /> prepared, by resolution or letter. <br /> 6. The CITY shall exercise its franchise right to. cause private utilities to <br /> be relocated at no expense to the STATE. <br /> 7. The CITY agrees to cause its utilities that have been located on STATE <br /> Righ t of Way or installed within the limits of a roadway after the said <br /> roadway was taken over for maintenance by the STATE, to be relocated <br /> and/or adjusted at no expense to the STATE. <br /> -2- <br /> 97016.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.