My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-154 AUTHORIZING INTER-GOVERNMENTAL COOPERATION AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-154 AUTHORIZING INTER-GOVERNMENTAL COOPERATION AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 4:02:27 PM
Creation date
7/14/2016 4:02:21 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-154
Res Ord Title
AUTHORIZING INTER-GOVERNMENTAL COOPERATION AGREEMENT WITH SANITARY DISTRICT OF DECATUR
Approved Date
10/18/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bids received and make recommendations of contract <br /> iaward. <br /> c. Consult with the OWNER and with the Contractor on <br /> interpretation of plans and specifications and reg- <br /> arding any changes under consideration as construc- <br /> tion proceeds. <br /> d. Provide periodical job-site inspection by the Pro- <br /> ject Engineer, or his representatives, during the <br /> construction period. <br /> e. Prepare and submit all payment estimates, change or- <br /> ders, records and reports required by the OWNER. <br /> f. Safeguard the OWNER against defects and deficiencies <br /> on the part of the contractor, but the ENGINEER does <br /> • not guarantee the performance of the contract by the <br /> contractor. <br /> g. Conduct final inspection of construction and prepare <br /> final a ers a <br /> p p nd re orts. <br /> P <br /> h. Revise contract drawings to show location and nature <br /> 0 <br /> f improvement as actually constructed and supply <br /> "as built" drawings consisting of a mylar set and <br /> one set of blue line prints to the OWNER. <br /> i. Inspect the contractor's operations to insure com- <br /> pliance with the plans and specifications and the <br /> keeping of complete project records. <br /> j . Check al�� shop and working drawings. <br /> k. Review and check all reports by testing laboratories <br /> • on equipment and material tested. � � <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.