My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-147 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-147 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 4:51:18 PM
Creation date
7/14/2016 4:51:17 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-147
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT CITY PROJECT 8918-C LAKE DECATUR DAM REHABILITATION - HYDRAULIC PIPING REPLACEMENT
Approved Date
10/4/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> B L A C K & V E A T C H <br /> Decatur, Illnois <br /> Lake Decatur Dam Improvements <br /> Hydraulic Piping Replacement <br /> Probable Construction Cost <br /> September 23, 1993 <br /> Page 3 <br /> Step Item Description Quantity Unit Unit Cost Total C <br /> ---- ---------------- -------- ---- --------- ------- <br /> $ <br /> STAGE II: (Cont'd) <br /> Saw cut pipe trench Lump Sum 14,600 <br /> Remove concrete encasement, <br /> pipe & reinforcement Lump Sum 20,000 <br /> Place non-shrink grout & <br /> pipe supports Lump Sum 1,500 <br /> 4. Replace supply & return lines <br /> B1, B2, B3 & B4 (S. of <br /> center wall) 1 1/4" SS Pipe <br /> (Owner furnished) 800 lin ft 10.00 8,000 <br /> SS Ball valves <br /> 3/4" 4 eaCh 70.00 280 <br /> 1/2" 4 each 40.00 160 <br /> 5. Refill B1 & B2 with oil & test Lump Sum 2,500 <br /> 6. Fill trench w/concrete 7.5 cu yd 1,500.00 11,250 <br /> Reinforcing (furnish & install) Lump Sum 11,000 <br /> 7. Remove supports & test Gate II Lump Sum 2,000 <br /> Total - Stage II $101,490 <br /> STAGE III: GATE I OUT-OF-SERVICE, GATE II IN <br /> SERVICE ON CYLINDERS 1B AND 3B <br /> Mobilization/demobilization Lump Sum 13,400 <br /> 1. Lock Gate I in place w/ <br /> supports Lump Sum 5,000 <br /> Move & reset working platform Lump Sum 10,000 <br /> 2. Shut off hydraulic fluids to <br /> supply and return lines <br /> B3 & B4 (Included w/Stage II) <br /> 3. Drain lines (2) of oil Lump Sum 1,500 <br /> Saw cut pipe trench Lump Sum 8,200 <br />' Remove concrete encasement Lump Sum 5,000 <br /> Place non-shrink grout & <br /> pipe supports Lump Sum 1,500 <br /> 4. Replace supply & return lines <br /> B3 & B4 (N. of center <br />' wall) , 1 1/4" SS Pipe <br /> Install Owner furnished 90 lin ft 10.00 900 <br />, Purchase & install 460 lin ft 25.00 11,500 <br /> 5. Test all pipe, valves, & <br /> connections Lump Sum 3,000 <br /> 6. Fill trench w/concrete 14 cu yd 1,500.00 21,000 <br /> Reinforcing Lump Sum 14,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.