My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-126 ACCEPTING THE PROPOSAL AND AUTHORIZING INTER-GOVERNMENTAL AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-126 ACCEPTING THE PROPOSAL AND AUTHORIZING INTER-GOVERNMENTAL AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 11:07:14 AM
Creation date
7/15/2016 11:07:12 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-126
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN INTER-GOVERNMENTAL AGREEMENT CITY PROJECT 9027
Approved Date
8/16/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:.. . . • . <br /> a. Stop work at a logical point when monies due the EN- <br /> GINEER are within the upper limit of reimbursable <br /> actual costs, or <br /> b. Continue work under the terms of the AGREEMENT up to an <br /> adjusted upper limit of reimbursable actual costs as <br /> authorized in writing by the OWNER. The ENGINEER will <br /> make no claim for payment in excess of the original <br /> upper limit of reimbursable actual costs without having <br /> received such written authorization prior to incurring <br /> the excess costs. <br /> 2 . The provisions of this Section and the various rates of <br /> compensation for ENGINEER's services provided for in this <br /> AGREEMENT have been agreed to in anticipation of the order- <br /> ly and continuous progress of the PROJECT and are based on <br /> a construction period of 150 consecutive calendar days as <br /> contained in the specifications for this PROJECT. The <br /> ENGINEER shall not be responsible for any time delays in <br /> the PROJECT caused by circumstances beyond the ENGINEER's <br /> control. <br /> 3 . The OWNER may at any time, by written order, make changes <br /> , within the general scope of this AGREEMENT in the services <br /> or work to be performed. If such changes cause an increase <br /> or decrease in the ENGINEER's cost or time required to <br /> perform any services under this AGREEMENT, an equitable <br /> adjustment shall be made and this AGREEMENT shall be modi- <br /> fied in writing. The ENGINEER must assert any claim for <br /> adjustment under this clause in writing within 30 days from <br /> the date of receipt of the ENGINEER of the notification of <br /> change unless the OWNER grants additional time before the <br /> date of final payment. No services for which an additional <br /> compensation will be charged by the ENGINEER shall be <br /> furnished without the written authorization of the OWNER. <br /> 4 . Services performed during the performance of the AGREEMENT <br /> made necessary by the following circumstances or events <br /> shall be considered as Additional Services: <br /> a. Services performed as a result of litigation, ar- <br /> bitration, public hearings or other legal or ad- <br /> ministrative proceedings involving the PROJECT other <br /> than a dispute between the OWNER and ENGINEER. <br /> b. Services performed to accomplish property surveys, pre- <br /> paration of legal description plats and documents for <br /> the acquisition of�easements and/or right-of-way, and <br /> assistance to the OWNER in acquiring any necessary <br /> easements and right-of-way. <br /> Payment for Additional Services shall be on a time and ex- <br /> pense basis to be computed at the technical payroll cost to <br /> the ENGINEER times a multiplier of 2 . 0. Technical payroll <br /> BGM 93028A -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.