My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-121 ACCEPTING THE PROPOSAL AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-121 ACCEPTING THE PROPOSAL AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 11:14:03 AM
Creation date
7/15/2016 11:14:02 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-121
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR WATERWORKS MASTER PLAN UPDATE
Approved Date
8/16/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 - ADDTTIONAL SERVICES OF THE ENGINEER <br /> 2.1 If authorized in writing by the CLIENT, the ENGINEER will fumish or obtain <br /> from others additional services of the following types which will be paid for by the <br /> CLIENT as extra services. <br /> 2.1.1 Additional services due to significant changes in scope of the PROJECT or <br /> their design including, but not limited to, changes in size, complexity, or due to time <br /> delays for completion of work, when such delays are beyond the control of the <br /> ENGINEER. <br /> 2.1.2 Revising previously approved studies, reports, design documents, drawings or <br /> specifications. <br /> 2.1.3 Preparing detailed renderings, exhibits or scale models for the PROJECT. <br /> 2.1.4 Furnishing additional copies of the Master Plan Report beyond ten (10) sets <br /> for the PROJECT. <br /> 2.1.5 Additional services in connection with the PROJECT including services <br /> normally fumished by the CLIENT and services not otherwise provided for in this <br /> Agreement. <br /> 2.1.6 Preparing to serve or serving as an expert witness for the CLIENT in any <br /> litigation or other proceeding involving the PROJECT'. <br /> SECTTON 3 - THE CLIENT'S RESPONSIBII.TTY <br /> 3.1 Provide full information as to his requirements for the PROJEC'I'. <br /> 3.2 Assist the ENGINEER by placing at his disposal all available information <br /> pertinent to the PROJEGT, including previous reports and any other data relative <br /> to design.and construction of the PROJECT. ', <br /> 3.3 Examine all studies, reports, sketches, estimates, specifications, drawings, I <br /> proposals and other documents presented by the ENGINEER and shall render in <br /> writing decisions pertaining thereto within a reasonable time so as not to delay the <br /> work of the ENGINEER. <br /> 3.4 Designate in writing a person to act as CLIENT'S representative with respect to <br /> the work to be performed under this AGREEMENT; and such person shall have <br /> complete authority to transmit instructions,receive information, interpret and define <br /> CLIENT'S policies and decisions with respect to materials, equipment elements and <br /> systems pertinent to the work covered by this AGREEMENT. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.