My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-68 AUTHORIZING CONTRACT - JERRY SAPP CONSTRUCTION
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-68 AUTHORIZING CONTRACT - JERRY SAPP CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:48:05 AM
Creation date
7/18/2016 11:48:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-68
Res Ord Title
AUTHORIZING CONTRACT - JERRY SAPP CONSTRUCTION
Approved Date
5/17/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A P R:- 1 2 - 9 3 M O N 2 0 : 4 8 D A H L - A R C H I T E C T S P _ 0 3 <br /> SECTION 09910 - PAGE 2 <br /> Exterior painting <br /> PART 2 - PRODUCTS <br /> 2 .0� MANUFACTURER5 <br /> A. The brard-name products listed in the schedu].e at the end <br /> oP th�s sectiott and made by the following manufacturer are <br /> the basis of the contract documents: <br /> 1. The Glidden Company. <br /> B. Products o£ the �ollowing manufacturers, provided the�► <br /> comply with requirements of the contract documents, will <br /> be among those considered in accordance with standard <br /> substitution proc�dures: <br /> 1. Senjamin Moore & Company. <br /> 2 . Pratt & Lambert, Inc. <br /> 3 . Sherwin Wil�fams Company. <br /> 4 . MA.B Paints and Goatings <br /> 2 . 0?. PRODUCTS <br /> A. Golors: <br /> 1. For multicoat systems, apply each coat using a <br /> successively darker tint or shade, unless approved , <br /> otherwa.se. <br /> 2 . Top coat colors: As indioated in color schedule. � <br /> E3. L�ad Content: � <br /> 1 . Not more than 0.06 percent lead by weight (calculated <br /> as lead metal) in the total nonvolatile content of the �i� <br /> paint or the equivalent measure of lead in the dried I <br /> film. <br /> 2 . Exception: Where permitted by app�.icable regulations. <br /> pART 3 - EXECU�ION <br /> 3 . �1 INSPECT�ON <br /> A. verify that surfaces and oanditions are ready for work in <br /> accordance with coating manufacturer's recommenda�ions . <br /> 3 . c►:� SURFACE PREPARATTON <br /> 1�. Apply coatings to surfaces that are clean and properly <br /> prepared in accordance with manufac�urer's instructions. <br /> Remove dirt, dust, grease, oils, and foreign matter. <br /> Prepare surface for proper texture necessary to optimum <br /> coating adhesion and intended finished ap�earance. Plan <br /> cleaning, �reparation, and coating operations to avoic� <br /> contam�,nation of freshly coated surfaces. <br /> 1 . Do not app�.y,coatings to labels that identify <br /> equipment, �fire-resistance ratings, etc� <br /> DAHL/2417 �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.