Laserfiche WebLink
V , � <br /> h\. <br /> ���1110LS ��f"tt'Y1P11t Final Report, Notice of Completion and <br /> af Tran�ortation Acceptance of Improvement Constructed <br /> Under the Illinois Highway Code <br /> Municipality Decatur The improvement was constructed in accordance with the plans approved by the <br /> Department on or as fol�ows:(describe change) <br /> Counry Macon January 1, 1985 to December 31, 1985 <br /> Road District 5 Length as built Cross Section as built <br /> Section 85-08509-00-TL Road Bed Width Surface Type <br /> Contractor Hubbard Electric Width Thickness <br /> Financial Statement <br /> Balance in Authorized <br /> Total Funds Received for Expended For <br /> TO BE <br /> Construction Credited to Credited <br /> Engineering Unobligated Unobligated <br /> Source Amount R.O.W. Const. Engr. R.O.W. Balance Balance <br /> MFT 225000.00 44227.45 180772.55 <br /> C�tY 145647.55 <br /> Totals 225000.00 189875.00 180772.55 <br /> Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. <br /> Remarks <br /> Submitted �` 7�— D'2.. ❑ County Engineer �y�--�'�' 7�G�� <br /> Date � Municipal Engineer <br /> Summary <br /> Final inspection of the work designated above was made on Item Cost <br /> and it was found to be completed substantially in accordance with all the require- Contract 189875.00 <br /> ments of the plans,specifications and contract. The financial statement is in Final Contract Cost" 189875.00 <br /> accordance with my records. <br /> d <br /> Distr' Engineer of Local Roads&Streets <br /> I recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the <br /> Total Const.Cost" 189875.00 <br /> Said improvement is hereby accepted by the Department of Transportation. R.O.W. <br /> Engineering <br /> Approved O� �l �jDl�Z <br /> ate <br /> Total Cost 189875.00 <br /> � <br /> Submit to Dist._`,L Engineer istrict En ineer ' For Day Labor sedions use estimated costs here. <br /> 5 copies for Municipal Work 9 '" Use actual construction cost regardless Contract <br /> 5 copies for Counry Work or Day Labor construdion. <br /> 6 copies for Road District Work <br /> BLR 7201 (Rev. 12/98) <br />