Laserfiche WebLink
. . <br /> � <br /> �\�y <br /> Illinois Department Final Report, Notice of Completion and <br /> af Transportation Acceptance of Improvement Constructed <br /> Under the Illinois Highway Code <br /> Municipality Decatur The improvement was constructed in accordance with the plans approved by the <br /> Department on or as follows:(describe change) <br /> County Macon January 1, 1985 to December 31,1985 <br /> Road District 5 Length as built Cross Section as built <br /> Section 85-08412-00-RS Road Bed Width Surface Type <br /> Contractor Illinois Valley Width Thickness <br /> Financial Statement <br /> Balance in Authorized <br /> Total Funds Received for Expended For TO BE <br /> Construction Credited to Credited <br /> Engineering Unobligated Unobligated , <br /> Source Amount R.O.W. Const. Engr. R.O.W. Balance Balance <br /> MFT 60000.00 48396.68 7259.50 - 4343.82 <br /> Totals 60000.00 48396.68 7259.50 4343.82 <br /> Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. <br /> Remarks State Section[13Z, 13Zj RS-1 #40150 60000.00 mft appropriated. <br /> Submitted /— �— O Z ❑ County Engineer .f/�_.� �`G�„i,o� <br /> Date � Municipal Engineer � <br /> Summary <br /> Final inspection of the work designated above was made on Item Cost <br /> and it was found to be completed substantially in accordance with all the require- Contract 55565.18 <br /> ments of the plans,specifications and contract. The financial statement is in Final Contract Cost" 55656.18 <br /> accordance with my records. <br /> _ L� z <br /> Distri Engineer of Local Roads&Streets <br /> I recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the <br /> Total Const.Cost"" 48396.68 <br /> Said improvement is hereby accepted by the Department of Transportation. R.O.W. <br /> Engineering 7259.50 <br /> Approved / 7ip.�L <br /> ate <br /> Total Cost 55656.18 <br /> Submit to Dist.�_ Engineer istrict E�neer � ' For Day Labor sections use estimated costs here. <br /> 5 copies for Municipai Work 9 "" Use actual construction cost regardless Contract <br /> 5 copies for County Work or Day labor construction. <br /> 6 copies for Road District Work <br /> BLR 7201 (Rev. 12/98) <br />