My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-42 FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-42 FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 9:36:28 AM
Creation date
7/19/2016 9:36:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-42
Res Ord Title
FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
Approved Date
3/29/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illinois Department Final Report, Notice of Completion and <br /> Of TYdtlSp01'�c'�'�lOtl . Acceptance of Improvement Constructed <br /> Under the Illinois Highway Code <br /> Municipality Decatur The improvement was constructed in accordance with the plans approved by the <br /> Department on or as follows:(describe change) <br /> County Macon January 1, 1988 to December 31, 1988 <br /> Road District . 5 Length as built Cross Section as built � <br /> Section 8$-08922-00-SP Road Bed Width Surface Type <br /> Contractor Width Thickness <br /> Financial Statement <br /> Balance in Authorized <br /> Total Funds Received for Expended For TO BE <br /> Construction Credited to Credited <br /> Engineering Unobligated Unobligated <br /> Source Amount R.O.W. Const. Engr. R.O.W. Balance Balance <br /> MFT 8000.00 <br /> Totals 8000.00 <br /> Use only one line for each source of funds,or purpose. Do not make a separate line for each receipt. , � <br /> Remarks No MFT Funds used for this vroiect. ' <br /> Submitted �—�j - — O � ❑ County Engineer . :S��G�s� <br /> Date �f Municipal Engineer <br /> Summary <br /> Final inspection of the work designated above was made on Item Cost <br /> and it was found to be completed substantially in accordance with all the require- Contract <br /> ments of the plans,specifications and contract. The financial statement is in Final Contract Cost" <br /> accordance with my records. � <br /> District gineer of Local R ds&Streets <br /> I recommend acceptance by the Department of Transportation. This improvement <br /> shall henceforth be maintained by the <br /> Total Const.Cost** <br /> Said improvement is hereby accepted by the Depa�tment of Transportation. R.O.W. <br /> Engineering <br /> Approved ll Za� Z <br /> Date <br /> �� Total Cost <br /> Submit to Dist._Engineer trict En in� ' For Day Labor sections use estimated costs here. <br /> 5 copies for Municipal Work 9 "* Use actual construction cost regardless Contract <br /> 5 copies for County Work or Day Labor construction. <br /> 6 copies for Road District Work <br /> BLR 7201 (Rev. 12/98) <br />
The URL can be used to link to this page
Your browser does not support the video tag.