My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-40 AUTHORIZING AGREEMENT - CAPITOL MACHINERY COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-40 AUTHORIZING AGREEMENT - CAPITOL MACHINERY COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:39:51 AM
Creation date
7/19/2016 11:39:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-40
Res Ord Title
AUTHORIZING AGREEMENT - CAPITOL MACHINERY COMPANY - CITY PROJECT 9293-30A & 30B
Approved Date
3/15/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . The City will assume , at it ' s expense, all cost to <br /> � repair or replace all parts and components normally consumed in <br /> day-to-day operations such as : tires, tubes , tire repairs , <br /> lubricating oil, filters of all types , grease, fuel, anti-freeze , <br /> cutting edges , batteries , headlights , glass breakage, wire rope , <br /> belts , brake linings , cleaning and painting. <br /> 7. Capitol shall have a parts availability policy to <br /> supply the City with new parts within 48 hours (excluding <br /> Saturday, Sunday and holidays ) or will furnish the parts upon <br /> request at no cost . Parts covered in this guarantee are those <br /> new parts required for normal repairs and maintenance necessary <br /> to keep the machine operating in a day-to-day operation. <br /> 8. The City will maintain equipment in accordance with <br /> normal published manufacturer 's recommendations. <br /> 9. Capitol has the right to inspect equipment during <br /> normal working hours at the City and make recommendations for <br /> repairs , improved maintenance , etc . , in keeping with the <br /> requirements stated by the manufacturer in the shop manual for <br /> the maintenance and repair of the piece of equipment . <br /> 10 . Capitol will be fully responsible for the total cost of <br /> all repairs (other than in Paragraph 6 ) to the equipment on the <br /> following Power Train items , in excess of the guaranteed maximum <br /> cost of repairs (as indicated on Exhibit A) for the time of <br /> operation in hours , or period of time in years , from the date of <br /> delivery, whichever occurs first (as indicated on the Exhibit A) . <br /> Engine , torque converter, transmission, drive shafts , universal <br /> joints, differential , transfer gear group, drive axles , drive <br /> pumps , drive motor, pinion and bevel gear, steering clutches , <br /> steering brakes , final drive gear trains (up to, but not <br /> including the sprockets or tires ) , fuel pump and turbocharger. <br />
The URL can be used to link to this page
Your browser does not support the video tag.