|
_ ' �.
<br /> � � , .
<br /> ;.. n
<br /> 'y ' } ' ' . . ' ' , "
<br /> ' - �� _ ' . � _ _ � .
<br /> . CIN OF DECATUR, ILLINOIS �
<br /> - CITY PROJECT N0. 9148
<br /> - ENGINEERING SERVICE AGREEMENT '
<br /> . � THIS AGREEMENT, made and entered into the '�� day of .J , A.D.,,19��;" . .
<br /> ' " by and between the CITY OF DECATUR, ILLINOIS, hereinafter referred to as the "CITY°and WVP �
<br /> - ; CORPORATION, hereinafter referred to as the,"ENGINEER",covers professional . � �
<br /> - � � engineering/architectureservices in connection with the preparation of plans, specifications,estimates .
<br /> � of cost and_construction of the proposed renovation of the Decatur Industry and Technology Center, :
<br /> _ � EDA Grant Project Number 06-01-2555. � " -
<br /> � , WITNESSETH THAT, in consideration of these premises and of the mutual covenants herein
<br /> � set forth, �
<br /> . ��_THE ENGINEER AGREES, ~ - ` , � � � . � , ' .
<br /> - � 1. Basic Senrices- To perform or be responsible for the performance of the following
<br /> ' professional engineering services for the CITY in connection with.the proposed improvements
<br /> � hereinafter described: .
<br /> a. . Hold start-up meeting including representativesfrom CITY, ENGINEER, and sub- .., � , - �
<br /> , consultant. • ,
<br /> , b. Perform on-site surveys as are necessary for the preparation of detailed plans.
<br /> -. , , � c. Prepare 35 percent complete sets of plans, specifications and iestimates and submit; , _�
<br /> _ - . three (3) se�s to,CITY for review. These will serve as a basis�for the final,�,�: . �
<br /> . _ construction documents. : , _ ; , _ . -
<br /> - .` d.. Items to be included in the construction�documents are as defined in the CITY's �- � ' �
<br /> � - : ' Request for Proposal dated October 24, 1991 and defined as Exhibit"A"which is � .� . . _
<br /> .. � - . attached and made a part of this AGREEMENT.:: - � , , � . "
<br /> : e. � . Assist the CITY in connection with the CITY's responsibilify for filing documents .
<br /> . `. ` _ required for the approval of govemmental authorities having jurisdiction over the ;
<br /> „ _ Project. � . _ _ � . . _ - . .
<br /> : -.�f. t Prepare 95 percent complete set of plans, specifications and estimates and,submit �- -
<br /> = - .. . , , : �� three (3) sets to CITY for review._` �' ,. . � - . ° � . . .
<br /> - - - : g., . �:• Make required revisions in plans, specifications and estimates based on 95;percent .� � . � . .
<br /> � " , . � �. review and submit final contract documents to the CITY. � . ' . � .: �
<br /> :, � ... , . " .,
<br /> � _ -- � , h., ' Two,review meetings,at the 35 percent and 95 percent stages, plus two additional .
<br /> _ � � i meetings are included in the lump sum fee. . .
<br /> , . , . , 1 , - . - , . . .
<br /> , . ' , • . ' -
<br /> � . . , - : . . - � ' - ., _ ' Ir„ . . . . � I�
<br />
|