Laserfiche WebLink
• . - EXHIBIT "A" <br /> • • January 12, 1993 <br /> • ' � Page 6 of 9 <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> C. PROJECT PLAN: (Continued) <br /> 7. PRODUCT - SITE RECONNAISSANCE NOTES <br /> ACTIVITIES: <br /> 7.01 Review all existing data. <br /> 7.02 Note characteristics of each corridor and sub-alternates <br /> (variation to alternate). <br /> 7.03 Identify viable alternatives. <br /> 8. PRODUCT - AERIAL MAPPING <br /> ACTIVITIES: <br /> 8.01 Draft boundary lines and ownership. <br /> 8.02 Draft major utility locations. <br /> 8.03 Highlight land use on undeveloped land. <br /> 8.04 Show all corridors studied (one symbol). <br /> 8.05 Show all acceptable corridors (another symbol) . <br /> 8.06 Show detention/retention basin (ADM). <br /> 9. PRODUCT - DRAINAGE EVALUATION REPORT <br /> ACTIVITIES: <br /> 9.�1 Evaluate drainage concept for each acceptable corridor. <br /> 10. PRODUCT - PAVEMENT DESIGN <br /> ACTIVITIES: <br /> 10.01 Develop typical cross section. <br /> 10.02 Design pavement for concrete and bituminous. <br />