My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R93-05 AUTHORIZING ENGINEERING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1993
>
R93-05 AUTHORIZING ENGINEERING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 3:35:59 PM
Creation date
7/19/2016 3:35:58 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R93-05
Res Ord Title
AUTHORIZING ENGINEERING AGREEMENT SCOPING STUDY FOR NEW ROADWAY TO CONNECT BRUSH COLLEGE ROAD WITH 22ND STREET
Approved Date
1/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� • • EXHIBIT "A" <br /> � • January 12, 1993 <br /> � � Page 8 of 9 <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> C. PROJECT PLAN: (Continued) <br /> 13. PRODUCT — TRAFFIC ANALY`�CS <br /> ACTIVITIES: <br /> 13.01 Review collected data. <br /> I <br />� 13.02 Determine worst case scenario and set up existing <br /> baseline traffic. <br /> I <br /> 13.03 Perform intersection capacity analysis based on 1985 <br /> Highway Capacity Manual . <br /> 13.04 Identify existing deficiencies. . <br /> 13.05 Using historical data, baseline traffic to design an <br /> analysis year. <br /> 13.06 Estimate additional traffic from major land use <br /> generators. <br /> 13.07 Review area travel patterns and previous studies. <br /> 13.08 Determine inbound and outgoing travel assignments (from <br /> best available information). <br /> 13.09 Assign increase development traffic to the <br /> transportation network. <br /> 13. 10 Perform intersection capacity analysis for future ' <br /> conditions and identify future deficiencies. ' <br /> 13. 11 Reassign traffic to alternate corridors and perform ', <br /> traffic analysis for each alternate. ' <br /> 13. 12 Determine necessary improvements. ', <br /> 13.13 Prepare traffic memorandum and exhibits for feasibility I <br /> study. I <br /> I <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.