Laserfiche WebLink
����~�� C O M PA N Y CO SNTRACTOR`� <br /> FABRICATORS AND ERECTORS OF CUSTOM-BUILT SHEET METAL WORK•SINCE 1927 <br /> LENNOX DISTRIBUTOR • 24-HOUR SERVICE <br /> 2020 E. OLIVE STREET • P.O. BOX 310 • DECATUR, ILLINOIS 62525 <br /> (217)429-2323 • FAX(217)429-2381 <br /> June 22, 1992 <br /> Mr. John A. Smith <br /> City of Decatur <br /> Public Works Department <br /> One Civic Center Plaza <br /> Decatur, Illinois 62523 <br /> Gen�ler�en: <br /> SUBJECT: NORTH WATER TREATMENT PLANT - BOILER STACK <br /> REPLACEMENT <br /> We are pleased to submit our proposal to complete the following <br /> work: <br /> 1. Remove existing flue from the insulated section of <br /> breeching in the basement, up the chase and out on the <br /> roof. <br /> 2 . Install an access opening in the north wall of the chase at <br /> the garage floor elevation. � <br /> 3. Furnish and install a new positive pressure boiler flue <br /> constructed of T304 stainless steel inner lining, 1" air <br /> space and aluminized steel outer jacket. New flue to start <br /> at insulated section of breeching in the basement and extend <br /> out through the roof terminating with a stack cap and bird <br /> screen. <br /> 4 . Provide a city permit. <br /> Our price to complete this work during a normal eight (8 ) hour <br /> day is $13,325.00, no sales tax included. <br /> We thank you for the opportunity to submit this proposal and <br /> hope to be of further service. <br /> Respectfully submitted, <br /> Kin r Compa <br /> us Habbe <br /> ssistant Vice President <br /> LH/dw <br /> h/city <br /> VENTILATION • HEATING AND AIR CONDITIONING • COMMERCIAL & INDUSTRIAL ROOFING <br />