Laserfiche WebLink
Project............................ 9207 (� � � <br /> STREET RESURFAC[NG (�ENGINEER�S ESTIMATE �DUNN COMPANY � <br /> � � - CONVENTIONAL �� �724 N. MERCER � <br /> �� �DECATUR, IL 62522 � <br /> Bid Date........................... JUNE 17, 1992 �) � � <br /> �) � � <br /> Time............................... 10:30 A.M. �� � � <br /> �� � � <br /> �� � � <br /> (� � � <br /> PAY ITEM � UNIT � QTY �� UNIT � TOTAL � UNIT � TOTAL � <br /> I I II PRICE � � PRICE I I <br /> Area Reflective Crack Control � S.Y. � 3,000 �� 0.75 � 2,250.00 � 0.85 � 2,550.00 � <br /> Bituminous Concrete Surface � � �� � � � � <br /> Course, Class I � TONS � 11,670 �� 35.00 � 408,450.00 � 34.75 � 405,532.50 � <br /> Leveling einder (Machine Method) � TONS � 500 �� 35.00 � 17,500.00 � 34.75 � 17,375.00 � <br /> Bituminous Materials RC70/CSS-IH � � �� � � � � <br /> (Prime Coat) � GAIS � 20,800 �� 0.80 � 16,640.00 � 0.80 � 16,640.00 � <br /> Bituminous Materials AC85-100 � � �� � � � � <br /> (Prime Coat) � GALS � 150 �� 1.10 � 165.00 � 1.10 � 165.00 � <br /> Prime Coat Aggregate � TONS � 250 �� 12.00 � 3,000.00 � 11.00 � 2,750.00 � <br /> Pavement Removal, Surface Coat � S.Y. � 2,000 �� 6.80 � 13,600.00 � 6.75 � 13,500.00 � <br /> Valve Box � EACN � 3 �� 140.00 � 420.00 � 140.00 � 420.00 � <br /> Manhole Frame & Lid, Type 1 � EACH � 3 �� 200.00 � 600.00 � 200.00 � 600.00 � <br /> �lalve Box to be Adjusted (Asphalt) � EACN � 105 (� 85.00 � 8,925.00 � 85.00 � 8,925.00 � <br /> Valve Box to be Adjusted (Concrete)� EACH � 3 �� 175.00 � 525.00 � 175.00 � 525.00 � <br /> Manhole to be Adjusted (Asphalt) � EACH � 3 �� 140.00 � 420.00 � 140.00 � 420.00 � <br /> Manhote to be Adjusted (Concrete) � EACH � 3 �� 160.00 � 480.00 � 160.00 � 480.00 � <br /> Mixture for Cracks, Joints, and � � �) � � � � <br /> Flangeways � TONS � 10 �� 125.00 � 1,250.00 ( 150.00 � 1,500.00 � <br /> � � �� � � � � <br /> � � �� � � � � <br /> � � �� � � � � <br /> ___________________________________�_________�_________��______________________�______________________� <br /> TOTAL BID (AS CORRECTED) � � �� 474,225.00 � 471,382.50 � <br /> Percent Over or (Under) ENGINEER�S ESTIMATE (0.60) <br /> SUPPLEMENTAI BID lTEM <br /> Street Sweeping � L. Mile � �� 530.00 � � 0 � 0 ( <br />